San Juan sacartepexAdvanced small conduit processingWhat are the implementation standards for

2023-12-16 02:17:15
965HP113924865Building materials86

Before the installation of the grouting pipe, it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.The glass fiber grouting pipe is a rigid product made of high-strength alkali free peeling fiber, which is made into a mesh base material through an internationally advanced fine knitting process and is surface coated. Unidirectional tensile plastic grouting pipe is a grouting pipe made of high-density polyethylene (HDPE) as raw material plasticized and extruded plate, punched, heated and stretched,San Juan sacartepexTunnel small conduit, extruded and pressed, and then punched with regular hole network, and then stretched longitudinally. In this process, the polymer is in a directional linear state and forms an oblong reticular integral structure with uniform distribution and high node strength. The tensile strength and rigidity of the grouting pipe are fully improved through the reorientation of the originally scattered chain molecules into a linear state by stretching.San Juan sacartepex, Good advantages of steel origin and convenient transportation enable us to meet customer requirements efficiently and quickly.Before the installation of the grouting pipe, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.Santa Maria,The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme. The length can be matched according to the construction requirements, without loss.


San Juan sacartepexAdvanced small conduit processingWhat are the implementation standards for



In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.The so-called direct grouting method refers to the method of directly placing the grouting pipe into the soil by vibrating or drilling. According to the different forms of grouting pipes, the direct grouting method can be divided into the grouting pipe grouting method, the flower pipe grouting method, the drill pipe grouting method, and the stop plug grouting method.Grouting pipe grouting method refers to the method of grouting directly through the nozzle at the lower part of the grouting pipe; The flower tube grouting method is a method of grouting through a grouting tube (flower tube) with multiple grouting holes on the side wall; The drill pipe grouting method refers to the method of grouting directly through the drill pipe for drilling.The main elastic element of the grouting pipe is the stainless steel grouting pipe, which compensates the axial, lateral and angular direction of the pipe by the expansion and bending of the grouting pipe.Encyclopedic knowledge,Causes of wrinkling: the blanking specification of pipe joint is too long.The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, punching, stretching, shaping, coiling and other processes. Compared with metal textile mesh and plastic woven mesh, it has light weight, high strength, isotropy, and antistatic, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint nozzle or bottom of the grouting pipe is not tightly sealed, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. We&#;d better remember these points of attention, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.


San Juan sacartepexAdvanced small conduit processingWhat are the implementation standards for



When the grouting pipe is laid, it shall be kept flat and tight without wrinkling, so that the grouting pipe has effective tension. After laying, it shall be rolled again with a clean steel wheel roller. Most urban roads use glass fiber grouting pipes with self-adhesive. The diameter of the glass fiber grouting pipe is . ~ times of the maximum particle size of the asphalt concrete surface aggregate. The ultimate tensile strength should be greater than kN / m, so as to give play to the anti reflection crack performance of the glass fiber grouting pipe. It can also ensure the shear resistance and adhesive force of the adhesive layer of the glass fiber grouting pipe.ranking, The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe.Injecting grout into the embedded grouting pipe can seal construction joints, cold joints, pipe leakage and joints between the ground walls. It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.San Juan sacartepex,Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage?The research shows that the friction between the grouting pipe and the soil is also greatly related to the water content and compactness of the soil. The grouting pipe itself has a pattern,San Juan sacartepexSupport small conduit, and is also a grid like integral geo reinforced material, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, a large deformation modulus, and the reinforcement is stable and uniform, which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material, which increases the stability of the project; The grouting pipe is especially suitable for the construction of high-speed highways, because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress, increase the deformation modulus of the soil, effectively enhance the strength of the soil and achieve the effect of stabilizing the project and long-term use.If any crack is found, when the joint is deformed and subjected to water pressure, the ability of the grouting pipe to resist external forces will be greatly reduced. When positioning the grouting pipe,San Juan sacartepexSelf drilling hollow anchor manufacturer, it must be kept flat at the interface, and the grouting pipe must not be allowed to roll or kink. If it is found that there is no twist, it should be adjusted in time. When casting and fixing the grouting pipe, the deviation of the grouting pipe shall be prevented, so as not to shorten one side and affect the water stop effect. When pouring and tamping the concrete, it must be vibrated sufficiently to prevent the poor combination of the grouting pipe and the concrete from affecting the water stop effect. The grouting pipe joint must be well bonded. If the construction site conditions are available the method of hot vulcanization connection can be used.?


404 Not Found

404 Not Found


nginx

Related articles

San Juan sacartepexAdvanced small conduit processingWhat are the implementation standards for

San Juan sacartepexAdvanced small conduit processingWhat are the implementation standards for

The following aspects shall be paid attention to during the construction of grouting pipe: when the...

评论列表

750HP120486450
2023-12-16 10:27:54

I finally waited until I bought it San Juan sacartepexAdvanced small conduit processing. At first, I was still wondering whether to buy it. I liked it a little bit. I was a little scared to read the comments. I was afraid that the quality was not good. It was not a genuine product. It was a bit different from the picture. However, everything is wrong, the things are good, authentic, the boss is good, and the logistics are good.

914HP134131469
2023-12-16 09:22:58

San Juan sacartepexAdvanced small conduit processing Very good, good quality and low price, express delivery is also fast, and inspection is also very standard.

409HP184720764
2023-12-16 10:23:26

Just paid, when will San Juan sacartepexAdvanced small conduit processing arrive, boss.

122HP117294921
2023-12-16 10:11:51

San Juan sacartepexAdvanced small conduit processing The quality is not bad, and the goods are delivered in time. I recommend you to buy it next time.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。