DresdenHydraulic lifting platformFailure cause analysis and improvement measures
2024-02-25 02:38:50Hydraulic oil should be kept clean and replaced every months; When repairing, maintaining, and cleaning the elevator, be sure to support the support rod.The concept of hydraulic boarding bridge is the power system of the boarding bridge. The large oil cylinder lifts the entire equipment inclined plate. When it is raised to a large height, the small oil cylinder begins to operate, which are effectively welded and have a long service life.Dresden,Attention should be paid to inspecting whether each steel wire rope has broken wires and loose strands. If it exceeds the relevant regulations, it must be replaced immediately. The care and maintenance of steel wire ropes should strictly follow the regulations.The lifting platform has been inspected and debugged before leaving the factory,DresdenVehicle mounted hydraulic lifting platform, and all technical indicators meet the design requirements. When in use, only the power supply needs to be connected, and the hydraulic and electrical systems basically do not need to be adjusted.PuttistDrain all the hydraulic oil in the oil tank, open the oil tank, take out the oil suction filter, clean it, and return it to the oil tank. Install it in its original position. Fill the fuel tank with new oil.The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.Maintain a smooth access road for external construction elevators and sufficient parking space for equipment. When using a crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the crane.
Mobile elevators are generally used in skyscrapers where electric elevators are used, as there is no need to stop midway, so fast elevators are needed. First go to the high-rise sky lobby (high-rise elevator lobby, Skylobby) from the ground, and then transfer to the ordinary elevator to the destination. Some new elevators use elevator pre calling systems which can pre call designated floors in the lobby. These passenger elevators can be decorated beautifully according to customer needs. Some passenger elevators are also equipped with air conditioning and television, so that customers can enjoy the scenery outside while riding.Any machinery needs to be maintained after use while others are set up in the cabin, let alone large machinery. Poor maintenance of elevators after use can reduce the lifespan of elevators. Today, the editor will tell you how to maintain elevators after use. In order to maintain the good technical condition of elevator machinery, ensure the safe use of on-site construction machinery, extend the service life of equipment, and reduce mechanical failures, construction enterprises must maintain according to the relevant regulations According to maintenance regulations, necessary equipment maintenance work should be carried out. It is not allowed to focus solely on the use and maintenance of the equipment. It is strictly prohibited for equipment to be taken out of warranty or repair.Before using the machine, the staff should carefully inspect the hydraulic and electrical systems to ensure that there are no leaks or bare leaks before use.Excellent service,What are the advantages of installing a guide rail type elevator for goods? The advantages of civil engineering are easy to install: there is no need for a machine room above the shaft, and the top layer can be installed at a height of more than meters. The computer room can be located within a radius of meters of the shaft, occupying an area of only - square meters. The hydraulic elevator is not equipped with a counterweight device to improve the utilization rate of the shaft area. The load and load cylinder of the hydraulic elevator directly act on the foundation pit, and the strength requirement for the shaft is low. A brick structure or brick concrete structure shaft is sufficient.Drain and discard the hydraulic oil from the hydraulic lifting cargo elevator. For the outdoor guide rail elevator, tighten the joint and remove the oil filter. After cleaning, clean it with compressed air,DresdenMovable hydraulic lifting platform, and then return it to the oil tank and connect the pipeline.The second is that the steel will have obvious thermal expansion effect at low temperature. Although this property of steel will be taken into account when designing and manufacturing hydraulic elevators, the environment is different after all. Under low conditions, the steel will have some unstable performance, such as hardness increase, toughness decline, etc. At this time, more attention should be paid to the maintenance of equipment to keep key parts to avoid dry grinding.
Use a heavy crane to lift the cage and lift it from above the standard sectionHome page recommendation,Before using the machine, the staff should carefully inspect the hydraulic and electrical systems to ensure that there are no leaks or bare leaks before use.Slow down the smoothness and hydraulic oil of various departments such as the gearbox, gearbox, as overloading can increase the burden on the motor and in severe cases, cause the motor to burn out.Dresden,The seat belt needs to be inspected every six months, with a load of kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, especially during storage. Store in a cool and dry place, and avoid rainy and snowy weather during work.