2023-04-10 13:18:50The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness.The advantages of the grouting pipe are as follows: The embedded grouting pipe can be injected with water by on-site pressure to confirm the water tightness of the joint. Grouting is required only when the joint leaks water. Classification of grouting pipe grouting pipe the grouting pipe is a plane mesh material of grouting pipe with certain flexibility. The main raw material is polyethylene grouting pipe. It is extruded into thin sheets by a grouting pipe extruder,The grouting pipe diffuses the load on it. When the reinforced soil is loaded, the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, showing better tensile performance. The tensile stress of the soil is transmitted to the grouting pipe, making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, enhance the overall tensile strength of the soil, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil, the space between the outer mold and the horseshoe surface is greater than the thickness of the pipe wall.
When the grouting pipe is installed, the axis deviation shall be ≤ cm, and the bearing capacity of the support joint shall meet the design requirements. When connecting the grouting pipes, bolts must be installed symmetrically and tightened in sequence. Meanwhile, in order to prevent excessive deflection of the grouting pipes when axial force is applied, the deflection must be corrected to the horizontal before axial force is applied.Interpretation and observation,Grouting pipe grouting pipe manufacturer clamp type grouting pipe grouting pipe price grouting pipe spot grouting pipe specification grouting pipe model grouting pipe raw material for grouting pipe grouting pipe is processed by welded pipe or spiral steel pipe, and grouting pipe processed by seamless steel pipe is generally rare in the market. The reasons are as follows: first, in terms of price, generally, the cost of grouting pipes made by welding is relatively low, which is easy for purchasers to accept. The cost of domestic products made of spiral steel pipes and seamless steel pipes is too high. Second in terms of processing technology, welded pipes are relatively easy to process, and the equipment required is relatively simple. If spiral steel pipes and seamless steel pipes are processed, the process is relatively complex. Manufacturing process and characteristics of clamp down grouting pipe clamp down grouting pipe is a kind of grouting pipe. Because only professional hydraulic clamps are required for connection,ChakaritaAdvance small conduit and pipe shed, it is also commonly called clamp down grouting pipe. The clamp grouting pipe has the following characteristics: the connection of the grouting pipe is simple, as long as the hydraulic clamp is required for connection. The grouting pipe has joints at both ends of the clamp type grouting pipe, which avoids the possibility of loosening and has good seismic resistance. Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint, nozzle or bottom of the grouting pipe is not tightly sealed, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. Wed better remember these points of attention, so that when they occur in the future, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes. Professional sales, absolute sound detection tube price advantage, providing the most cost-effective products.How heavy is a grouting pipe?Chakarita, It is safe and does not need to be welded on site.The grouting pipe with the grouting pipe as the core flexible element can be compensated in the axial, lateral and angular directions on the pipeline. From the perspective of its performance, the internal pressure grouting pipe can be displaced in three directions, but because it is limited by casing and other accessories, it can often only be displaced in the axial direction. Therefore, so as to select correctly. The working principle of the grouting pipe is to use its own elastic deformation to compensate the axial, angular lateral and combined displacement of the pipe due to thermal deformation, mechanical deformation and various mechanical vibrations. The compensation has the s of sealing, pressure resistance, temperature resistance, corrosion resistance, impact resistance, vibration reduction and noise reduction, which can reduce the deformation of the pipe and improve the service life of the pipe.The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.