UlanhotThree wheel electric elevatorCommitment and trustworthiness
2023-10-23 05:10:59Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened,UlanhotOutdoor electric lifting platform,UlanhotSelf propelled electric elevator, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.Double layer steel mesh: The diameter of the steel bars is mm, with a spacing of mm.Ulanhot,The impact load can cause early wear, fracture, and fragmentation of mechanical structural components, as well as generate impact pressure in the hydraulic system, which in turn can damage hydraulic components, oil seals, and high-pressure oilBefore installation, the installation unit should confirm that the foundation, foundation bearing capacity,UlanhotElectric lifting scissor lift, embedded parts and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.Moca,Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.Setting requirements: The landing door should be standardized and tooled.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around -mm, and the top layer is not affected. It can be customized according to the location and environment.
Model Example: Hanging Cage Specification: LABSC/TDx Type I: ~ Type II: ~ Type V: ~ Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x. (kN).The pressure joint between the pipe joint and the rubber hose fails prematurely,The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than m. In special circumstances, when the net height of the building entrance is less than m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than m. (Article of GB-)The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than m. In special circumstances, when the net height of the building entrance is less than m, it is allowed to lower the height of the lower door opening, but in any case the net height of the lower door opening is not less than m. (Article of GB-)To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, back, left and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling and lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.
Double layer steel mesh: The diameter of the steel bars is mm, with a spacing of mm.Welcome calls ,Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.Steel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the lifting cage until it is approved by a professionalManual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor positionUlanhot,Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descentSecondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, it must be automatically lifted and lowered to times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed mm.