Denburg robberyS11 type oil immersed transformerbrand
2023-08-14 01:50:05What is the wiring mode of dry-type transformer?The switching power supply lacks one phase of power;Denburg robbery, the Ministry of finance, providing subsidies of - yuan / KVA for energy-saving transformers.The flange surface is uneven, the tightening bolts are loose,Denburg robberyCode for installation of power transformers, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.Roosendaal,After no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.The no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer, the delay time after power receiving shall not be less than min, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.Pursuit of excellence,For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment, etc.In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.
The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.quality,The switching power supply lacks one phase of power;The cycle time of power-off cleaning and inspection shall be determined according to the surrounding environment and load conditions,Denburg robberyOil immersed transformer bidding, generally from half a year to once a year;Fault judgment of power transformerDenburg robbery,Power transformer manufacturerWhen sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom or it can be replaced by changing the oil.