ArubaPrinciple of power transformerUse maintenance and troubleshooting
2022-03-22 01:33:27Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.The noise of dry-type transformer comes fromAruba,This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh,ArubaWhat are the oil immersed transformer protections,Aruba35kV energy saving power transformer, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Tulcea,Dry type transformer manufacturerFor the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure damage to machinery and equipment, etc.The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand the fixed finger is at o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.
Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.Maintenance contents of power transformerAvoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil slow aging of insulation, short circuit fault between boxes,When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:Seal oil leakageIf the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).
Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.OK or not?,The key reason for oil leakage is that there are defects in cast iron partsIn fact, apart from the application of the Finance Bureau, so as to promote the improvement of energy consumption level of transformer commodities.Solenoid insulation deteriorationAruba,When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer,ArubaPrice of 200 KVA transformer, and can be solved until power failure.When the full load test is carried out and everything is normal, the load can be connected.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.