PanamaBasic knowledge of power transformerThe value of using standards
2023-01-16 20:10:50When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.How to make up oil for oil immersed transformer?(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it,The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column,PanamaDry type transformer 1250kva, but there are many calculation methods.The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.The key reason for oil leakage is that there are defects in cast iron parts
The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.new product,PanamaTransformer oil,When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,When the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil, it is also necessary to carry out high and low temperature test and sludge test and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.Dry type transformerPanama,PanamaTechnical parameters of scb12 dry type transformer,The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.Dry type transformer manufacturer