2022-04-26 12:52:18For the leakage that has already occurred, find the leakage point first which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation,KuridabatPrice of 2000kVA dry type transformer, the goal of long-term treatment of leakage can be achieved.Before application, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.Kuridabat,Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, you should carefully inspect the equipment and parts until you find out the cause.Analysis of common faults of oil immersed transformer:Leposavic,After hours of continuous trial operation with a certain load the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.What is the wiring mode of dry-type transformer?With the rapid development of society and the continuous development trend of computers,Kuridabat630 oil immersed transformer, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope,KuridabatProduction process of oil immersed transformer, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.
When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.In order to promote the use of energy-saving transformers, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as , providing subsidies of - yuan / KVA for energy-saving transformers.The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?Bidding,Causes of fire in power transformerPower transformer manufacturerThe oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.
Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.Manufacturing cost,Noise dispersion of dry-type transformerHand touch method for transformer inspectionPower transformer manufacturerKuridabat,& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.