2023-01-10 03:37:44The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.Push the rock powder and sundries that are not washed, remain at the hole bottom, or stick to the hole wall out of the grouting range so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.ChimaltnangoPrecision tubeOur prices are falling frequently and the market is poor,2023-01-1003:37:43● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method double liquid silicification method, aerated silicification method and electric double liquid silicification method.
Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, aerated silicification method and electric double liquid silicification method.A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it plays a guiding role in drilling. During grouting, it is used to install orifice closure device to prevent slurry leakage.Chimaltnango,Grigiskes,ChimaltnangoSteel pipe,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.