Las LomasPrinciple of power transformerCommon sense of value selection

2022-11-17 00:34:42

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.Seal oil leakageLas Lomas,The proper selection of Anhui dry-type transformer has a key effect on improving the safety and smooth operation of power system software. In the above original text, we have already mastered the structure and characteristics of dry-type transformer. In this part, we will describe how to select dry-type transformer according to the load characteristics and application environment of dry-type transformer.The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by %.Alauer,Then clamp the branch pipe with your thumb, clearly put forward the glass test tube rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety,Las LomasAmbient temperature requirements for dry-type transformer,Las LomasPrice list of 250kVA box type transformer, otherwise it will have an adverse impact on life safety.The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.


Las LomasPrinciple of power transformerCommon sense of value selection



If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, but we must pay attention to many problems in the whole process of applying power transformer.Sound, causing short circuit obstruction. If not handled properly it will cause great damage.Total quality management,Oil immersed transformer operationThere are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet,(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m,Las LomasStructure of 35 kV oil immersed transformer, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.It should be said that after the development trend of these years, the overall level of China's transformer industry at this stage is basically international, and the quality level is no different from that of overseas goods& rdquo; The person in charge of the transformer Federation of China Household Appliance Industry Association said.Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.Las Lomas,Deterioration damage of transformer core insulationAfter sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.Operation of oil immersed transformer

404 Not Found

404 Not Found


nginx

Related articles

Las LomasPrinciple of power transformerHow can we make the best use of everything

Las LomasPrinciple of power transformerHow can we make the best use of everything

Oil leakage of cast iron partsThe power transformer belongs to relatively durable electrical equipme...

评论列表

965HP113924865
2022-11-17 07:58:48

When Las LomasPrinciple of power transformer offer discount points for activities, contact me when there are discounts

409HP184720764
2022-11-17 08:49:40

Las LomasPrinciple of power transformer Very satisfied, good quality.

984HP143755493
2022-11-17 09:08:16

The stuff is really good, but Las LomasPrinciple of power transformer the price is a bit more expensive, but it is still worth the money. This is the first time I bought it, thanks to your shopping guide.

263HP145816628
2022-11-17 09:06:03

Las LomasPrinciple of power transformer The price is very high, and the quality is very good if you can buy it at such a price.

709HP180518493
2022-11-17 08:54:36

Your company Las LomasPrinciple of power transformer has a very good service attitude, thank you, and like you.

256HP158312377
2022-11-17 08:51:51

Good seller, Las LomasPrinciple of power transformer things are very good. Come back in the future. You can buy with confidence.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。