AnkrajPower transformer systemmonopoly

2022-03-12 01:34:35

Operation and maintenance management of oil immersed transformerWhen the full load test is carried out and everything is normal, the load can be connected.Ankraj,Several detection methods for installing transformer() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.GotzisThere are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.Deterioration damage of transformer core insulationPower transformer factory


AnkrajPower transformer systemmonopoly



After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.The fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate, and then the iron loss is considered and the copper loss is ignored. In fact, for a certain load the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer, so it consumes electromagnetic energy.Deterioration damage of transformer core insulationDiscountThe zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb,AnkrajSpot inspection standard for dry type transformer, and loosen your thumb to make the oil enter the pipe,(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.


AnkrajPower transformer systemmonopoly



If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes,Ankraj315 KVA oil immersed transformer, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core,AnkrajTechnical parameters of 10kV oil immersed transformer, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Credit guarantee,If the volume of power transformer is too small, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.Principle of step-up dry-type transformer: the step-up dry-type transformer is a component that correspondingly converts low communication AC voltage, small current and large characteristic impedance. When there is an AC circuit in the original coil, the communication AC magnetic flux will be caused in the transformer core (or magnetic core), causing the magnetic induction voltage in the primary coil (or current).The voltage regulating tap changer is not in place or poorAnkraj,Connection group structure of dry-type transformer(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

404 Not Found

404 Not Found


nginx

Related articles

MalapiPig platform lifting platformUpgrading and transforming of the main business to add fuel

MalapiPig platform lifting platformUpgrading and transforming of the main business to add fuel

The situation and content of the lifting platform are very crucial. During the process, the current...

Irish rootAluminum alloy mobile lifting platformHow much is the quotation

Irish rootAluminum alloy mobile lifting platformHow much is the quotation

The standard rack free design of the lifting and lowering machine with high safety performance ensur...

PenickStructure introduction of oil immersed transformerProspects and industry situation

PenickStructure introduction of oil immersed transformerProspects and industry situation

For the installation of lightning rod, it is very easy to damage the relay protection inside and out...

EssenRail-type lift platform Premium brand

EssenRail-type lift platform Premium brand

people should be able to follow the direction and check some basic operating systems in the early s...

AnguoSingle mast aluminum alloy lifting platformPrices are making a comeback

AnguoSingle mast aluminum alloy lifting platformPrices are making a comeback

Regularly check whether the operation of each mechanism is normal and whether there is any noise. If...

AjakshawRamseyCan high density block radiation?

AjakshawRamseyCan high density block radiation?

When the wall bracket adopts non matching standard products, design calculations should be carried o...

评论列表

409HP184720764
2022-03-12 08:49:43

The logistics of AnkrajPower transformer system is a bit slow. Overall it's good, I hope I have a chance to cooperate next time

984HP143755493
2022-03-12 10:18:32

After looking for the AnkrajPower transformer system from your family for a long time, I mustered up the courage and the quality of the inspection was very good.

570HP155642700
2022-03-12 08:41:17

AnkrajPower transformer system The price is very high, and the quality is very good if you can buy it at such a price.

709HP180518493
2022-03-12 08:42:16

The festival is coming soon, can AnkrajPower transformer system be discounted?

256HP158312377
2022-03-12 09:34:59

Great AnkrajPower transformer system, very good service, thank you.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。