ShirakawaPower three-phase transformerSurface treatment process

2022-11-04 11:08:01
we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.Shirakawa,The efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the smaller the output power, the lower the efficiency.Power transformers are used in all walks of lifeRengo,In the whole process of transmitting electromagnetic energy in the power supply system,ShirakawaAmorphous alloy distribution transformer,ShirakawaPrefabricated box type transformer substation,ShirakawaHow much is a power transformer, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.Power transformer manufacturerDry type transformer factory


ShirakawaPower three-phase transformerSurface treatment process



The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, the closing shall be maintained by high-voltage arrester, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.Trustworthy,Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.


ShirakawaPower three-phase transformerSurface treatment process



Oil immersed transformer operationranking,During no-load test run, and then make the working voltage impulse closing.Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches ℃, the system software outputs the overtemperature alarm system; If the temperature rises to ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Shirakawa,& ldquo; YN, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock, the phase voltage phasor of the secondary side is at o'clock. That is the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

404 Not Found

404 Not Found


nginx

Related articles

ShirakawaPower three-phase transformerOffer sheet

ShirakawaPower three-phase transformerOffer sheet

Operation and maintenance management of oil immersed transformerThe scientific research of power tra...

评论列表

416HP186602172
2022-11-04 13:05:29

In anticipation, I finally waited for my beloved ShirakawaPower three-phase transformer, I wish the boss a prosperous business and wealth!

35HP162657470
2022-11-04 13:03:37

The logistics is very fast, look forward to working together again

717HP127443542
2022-11-04 12:27:13

Happy cooperation and tight packaging. Let’s talk about business services: Like

632HP195506591
2022-11-04 13:07:37

The manager is nice! ShirakawaPower three-phase transformer is also real.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。