WarsawBoarding axle hydraulic pressureWhat matters should be paid attention to during installation and maintenance

2024-05-07 02:17:52

After the boarding bridge work is completed,WarsawBoarding axle brand, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.As an important part of the boarding bridge the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from mm to mm. The hydraulic lifting stroke height ranges from mm to mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is mm, which can be met by almost all freight vehicles (with a general vehicle height of ).Warsaw,Features: Utilizing a sleeve type drag chain structure to achieve high-altitude operation with telescopic arms, the platform vehicle can achieve ° Rotating, both the work platform and the platform truck can be operated. The work platform truck can safely walk with the boom in any position,WarsawMobile folding boarding bridge, and the walking speed decreases with the rise of the lifting height.For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.Sihanouk,When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every hours of operation.The pressure on the axle will reduce the service life of the boarding axle.Open the manual valve, slowly lower the boarding bridge, and secure more than % of the lip plates at the bottom of the container.


WarsawBoarding axle hydraulic pressureWhat matters should be paid attention to during installation and maintenance



Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.Welcome calls ,Open planning before placement makes it easy to clean up clutter.During use, close attention should be paid to the condition of the equipment and if there are any problems, the use should be stopped immediately.The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, it can occupy a certain space, which is not necessary. So a reasonable width is necessary usually the width of the electric hydraulic boarding bridge is mm, mm, and mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, but everyone still cares about the internal width, which is the width of the channel.


WarsawBoarding axle hydraulic pressureWhat matters should be paid attention to during installation and maintenance



When confirming that the lip is fixed to the container, pull out the hook to hook it into the container, tighten the chain to ensure that it does not loosen, and press the brake blocks on both sides. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed,During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.Outdoor elevators and factory cargo elevators are heavy lifting mechanical equipment. Outdoor elevators are used for transporting goods between floors of buildings, and are specialized hydraulic cargo elevator products. They are mainly used for transporting goods up and down between various working floors; Vertical garage and car lift between garage floors. The hydraulic system of the product is equipped with anti fall and overload protection devices, and operation buttons can be set on each floor and lifting platform workbench to achieve multi-point operation. Long term promotion of axle manufacturers' complete products, excellent quality, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts,WarsawMobile boarding axle hydraulic pressure, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.Warsaw,Shake the handle to raise the boarding bridge to the height of the container.  . Before use, check the boarding bridge for obvious damage such as cracks and broken wires.Slowly reverse and park the container under the lip at the front of the boarding bridge.


404 Not Found

404 Not Found


nginx

Related articles

Qi geqiPittsburghWhat are the basic requirements for manufacturing

Qi geqiPittsburghWhat are the basic requirements for manufacturing

and safety considerations should be taken into account in stage design. According to relevant natio...

Lv LiangSelf walking aluminum alloy lifting platformPrecautions before use

Lv LiangSelf walking aluminum alloy lifting platformPrecautions before use

How to maintain and maintain the stage? When using the lifting stage in daily life, attention should...

RilystadHydraulic lifting platform elevatorHow to adjust the glass to a better state

RilystadHydraulic lifting platform elevatorHow to adjust the glass to a better state

RilystadHydraulic system lifting platform,It is necessary to regularly inspect the brake of the guid...

TongliaoVehicle mounted hydraulic lift platformThe price can't go up and down

TongliaoVehicle mounted hydraulic lift platformThe price can't go up and down

The power unit is adjusted whether it is a fork -cut lifting platform or a rail -type lifting cargo...

Li ShiMast type aluminum alloy elevatorMain classification

Li ShiMast type aluminum alloy elevatorMain classification

The time and price of aluminum alloy elevators will also be determined based on the order cycle of t...

Ridker Indoor hydraulic lifting platform carAnti-corrosion method

Ridker Indoor hydraulic lifting platform carAnti-corrosion method

When working in a hot environment, pay attention to heat dissipation.Fault analysis of mobile elevat...

评论列表

750HP120486450
2024-05-07 09:27:27

WarsawBoarding axle hydraulic pressure It was posted very quickly, really timely, please give me a thumbs up

466HP159575805
2024-05-07 09:55:04

WarsawBoarding axle hydraulic pressureVery good, very supportive, very good quality, exactly the same as described by the seller, and the price is cheap

984HP143755493
2024-05-07 09:27:20

Ask, can I send WarsawBoarding axle hydraulic pressure specific specifications, let me call you guys.

570HP155642700
2024-05-07 11:06:25

Ha ha. WarsawBoarding axle hydraulic pressure It’s here so soon, it’s not bad, next time you come, you can ask for a discount ^_^

263HP145816628
2024-05-07 10:26:24

WarsawBoarding axle hydraulic pressure How much is the minimum, can it be wholesale

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。