Shangri la townDouble layer small conduit advance supportHow to effectively remove impurities in

2023-01-23 01:02:37
965HP113924865Building materials190

The grouting pipe with the grouting pipe as the core flexible element can be compensated in the axial,Shangri la townAdvance small conduit for tunnel, lateral and angular directions on the pipeline. From the perspective of its performance, the internal pressure grouting pipe can be displaced in three directions, but because it is limited by casing and other accessories, it can often only be displaced in the axial direction. Therefore, the user needs to indicate the displacement in several directions when selecting and ordering, so as to select correctly. The working principle of the grouting pipe is to use its own elastic deformation to compensate the axial angular, mechanical deformation and various mechanical vibrations. The compensation has the s of sealing lateral and combined displacement of the pipe due to thermal deformation, pressure resistance, temperature resistance, corrosion resistance, impact resistance, vibration reduction and noise reduction, which can reduce the deformation of the pipe and improve the service life of the pipe. It has good flexibility. The pipes can be coiled when they are produced, so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, easily bypass obstacles, and is convenient for construction.Shangri la town,Polymer chemical grouting method is applicable to reinforcement of sandy soil foundation, curtain grouting of dam foundation, water stop and leakage stoppage of underground engineering, reinforcement of muddy interlayer of dam foundation and fault fracture zone. There are many varieties of polymer chemical pulp materials, including epoxy resin, acrylamide (propionate) polyurethane (cyanogen), lignin, etc. Acrylamide and polyurethane are commonly used in chemical grouting of foundation. Acrylamide pulp is composed of main agent acrylamide and various admixtures. The viscosity of the slurry is close to water, and it has good groutability. After the slurry solidifies, the gel is impermeable, and has good durability and stability. This kind of slurry is widely used in seepage prevention grouting of fine rock cracks and medium fine sand layers and dynamic water leakage stoppage projects. This kind of pulp has certain toxicity and pollutes air and groundwater. The polyurethane slurry is mainly composed of polyisocyanate and polyether resin, and then mixed with various admixtures. After the slurry is poured into the formation, which can strengthen the foundation and prevent seepage and leakage. Polyurethane slurry can be divided into water-soluble and non-water-soluble. The water-soluble polyurethane can be miscible with water and react with water to form an aqueous gel; Water insoluble polyurethane can only be miscible with organic solvents. Polyurethane slurry has low viscosity, good groutability, high stone strength, safety and reliability, simple operation and high economic benefits. The grouting pipe is a patented product. Compared with similar products in the market,Answer: Yes, the elastic extension speed of the grouting pipe can be defined within a certain range in the design, but for a grouting pipe that has been designed,Shangri la townSmall conduit support, its elastic extension speed is certain.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile. It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.


Shangri la townDouble layer small conduit advance supportHow to effectively remove impurities in



Before the installation of the grouting pipe, it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.Injecting grout into the embedded grouting pipe can seal construction joints, cold joints, pipe leakage and joints between the ground walls.If any crack is found, it shall be repaired in time, otherwise, when the joint is deformed and subjected to water pressure, the ability of the grouting pipe to resist external forces will be greatly reduced. When positioning the grouting pipe, it must be kept flat at the interface, and the grouting pipe must not be allowed to roll or kink. If it is found that there is no twist, it should be adjusted in time. When casting and fixing the grouting pipe, the deviation of the grouting pipe shall be prevented, so as not to shorten one side and affect the water stop effect. When pouring and tamping the concrete, it must be vibrated sufficiently to prevent the poor combination of the grouting pipe and the concrete from affecting the water stop effect. The grouting pipe joint must be well bonded. If the construction site conditions are available the method of hot vulcanization connection can be used.?Equipment maintenance, It has good flexibility. The pipes can be coiled when they are produced, and is convenient for construction.The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption, it is OK if the pipe wall can bear the lateral pressure of new concrete, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint, nozzle or bottom of the grouting pipe is not tightly sealed, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. We&#;d better remember these points of attention, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.


Shangri la townDouble layer small conduit advance supportHow to effectively remove impurities in



The main elastic element of the grouting pipe is the stainless steel grouting pipe, which compensates the axial, lateral and angular direction of the pipe by the expansion and bending of the grouting pipe.Sales Department,In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the roller rolls after it. The effect is good, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, and forbid vehicles to swerve, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water, and construction shall not be carried out in rainy days or wet roads; Glass fiber grouting pipe is made of grouting pipe, which is easy to irritate human skin. Construction personnel must wear protective gloves; When the grouting pipe is laid, the temperature of the road surface is required to be between . Therefore, the relative displacement trend or relative displacement will occur between the narrow two, which will then generate friction. This friction is generally called 'surface friction'.It depends on what kind of syrup you inject. What kind of construction site. There are two kinds of general grouting pipe inner diameters and The diameter of the hole is -mm at most. There are also about mm. The grouting pipe is used to pad the bottom of the horseshoe, change the cooperation specification of the mold, and adjust the cooperation space between the lower tire and the horseshoe.Shangri la town,Plastic pipe plastic pipe has a low acoustic impedance, which is used as a grouting pipe and has a large acoustic transmission rate. It can usually be used for smaller cast-in-place piles. It should be cautious when used in large-scale cast-in-place piles - because large-diameter piles need to be poured with a large amount of concrete, and the hydration heat of cement is not easy to dissipate. In view of the great difference between the thermal expansion coefficient of plastic and concrete,Shangri la townGrouting anchor, the plastic pipe will shrink radially and longitudinally due to the temperature drop after concrete solidification, It may be separated from the concrete locally to cause air or water crevices, and add more strong reflection interfaces on the sound path, which is easy to cause misjudgment.The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness.Can the stretching speed of grouting pipe be defined?


404 Not Found

404 Not Found


nginx

Related articles

Shangri la townDouble layer small conduit advance supportHow to effectively remove impurities in

Shangri la townDouble layer small conduit advance supportHow to effectively remove impurities in

Shangri la townLeading small conduit manufacturer,Two convex grooves are planned at the end of the b...

评论列表

965HP113924865
2023-01-23 09:53:12

This store is really good, with good quality and low price, the owner is very generous, and the customer service is also very patient. I don’t understand this Shangri la townDouble layer small conduit advance support. They explain to me patiently. It is really the conscience of the industry. I want to recommend this shop to my friends and let them all come to this shop to buy clothes!

466HP159575805
2023-01-23 09:25:09

Shangri la townDouble layer small conduit advance supportThe quality is good, completely beyond expectations, and the delivery speed is very fast.

122HP117294921
2023-01-23 08:22:01

After receiving the goods, I feel that the quality Shangri la townDouble layer small conduit advance support is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fast, the logistics company’s service attitude is very good, and the delivery speed is very fast. In general, this This is a very satisfying purchase, thank you to the seller.

256HP158312377
2023-01-23 09:55:20

Your service is very good, Shangri la townDouble layer small conduit advance support is also very cheap! I will come often in the future!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。