LodzPrice of Small Household Sightseeing ElevatorThe molding process is different

2024-03-25 00:51:09

  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.),Slide elevators are installed inside buildings and are often used parallel to buildings and sidewalksThere is a dedicated fire telephone in the fire elevator car.BukharaThe beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally,LodzAccessible vertical elevator, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesPlease note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel, there is no restriction between the two escalators.Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.


LodzPrice of Small Household Sightseeing ElevatorThe molding process is different



The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.The elevator suddenly opens the door and does not move after leveling, but automatically resumes operation after a few minutes: The elevator (escalator) has been running for too long, and the motor overheats. To prevent burning out, the motor cools down and automatically resumes operation.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.Bidding,The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then,LodzGrain hydraulic flipper, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width etc.),LodzHousehold indoor elevator small, then consider the non-standard design of the elevator.


LodzPrice of Small Household Sightseeing ElevatorThe molding process is different



The mechanical components of the elevator's traction machine require oil. There are two scales on the outer cover of the traction machine. Open the oil nozzle to check that the oil should be in the middle of the two scales. If the oil is lower than the lower scale, it means that the traction machine should be refueled. If not refueled, the elevator will not operate well for a long time, leading to the burning of the elevator traction machine and motor. After the elevator has been running for a long time, the oil should be replaced in a timely manner to keep the traction machine clean and in good condition.Quality assurance,Restore the command button function in the cabin for firefighters to operate.If there is a reserved shaft in the villa residential area, the appropriate car model can be selected by comparing the width and depth of the elevator car based on the size, width, and depth of the shaft. If there is no reserved shaft, you can first choose the model of the elevator and create a new shaft based on the required reserved size space for different models.The front room of the fire elevator is equipped with indoor fire hydrants.Lodz,The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams steel beams can be considered to be added between the frames for rectification.Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturers


404 Not Found

404 Not Found


nginx

Related articles

SeksadHydraulic lifting platform for warehouse useMaintenance process in the process

SeksadHydraulic lifting platform for warehouse useMaintenance process in the process

However, when using construction elevators, the first thing to ensure is the safety of the workers'...

FengnanIndoor hydraulic lifting platformHow to choose the medium for cooling

FengnanIndoor hydraulic lifting platformHow to choose the medium for cooling

Lifting and loweringPrecautions for elevator installation: Keep the access road of external construc...

NingxiaHydraulic lifting platform for warehouse useWhat are the markets for investment

NingxiaHydraulic lifting platform for warehouse useWhat are the markets for investment

The design of the power unit is good. Most of the power units of guide rail electric elevators have...

Mexico CityChangtanWhat are the maintenance methods?

Mexico CityChangtanWhat are the maintenance methods?

Setting requirements: Drainage measures should be set up for the foundation of construction electric...

JukapaTwo stage slurry pumpThe rising market is coming

JukapaTwo stage slurry pumpThe rising market is coming

  The submersible slurry pump is developed to adapt to the increasingly complex working conditions a...

LitvinovWhat is dry type transformerDesign method

LitvinovWhat is dry type transformerDesign method

The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in...

评论列表

161HP196399230
2024-03-25 09:12:50

Just received the goods, very good, LodzPrice of Small Household Sightseeing Elevator great value for money! ! Come in the future!

258HP138990173
2024-03-25 09:39:27

LodzPrice of Small Household Sightseeing Elevator Delivery is really fast, too efficient, the product has been received, give you a good comment.

605HP153695373
2024-03-25 08:00:25

I heard a colleague's introduction to buy LodzPrice of Small Household Sightseeing Elevator, and they all said that the quality is good, and I will come to your house next time. Ha ha.

632HP195506591
2024-03-25 08:42:50

LodzPrice of Small Household Sightseeing ElevatorHow is the quality? Do you have it in stock?

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。