HonoluluPower Bureau transformerThe role of each component

2022-03-08 00:48:45

The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified, it will be grounded from the surrounding grounding body.The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, and the phasor of the phase voltage of the secondary side is used as the second hand.Honolulu,Two point grounding device of iron core caused by residual welding scar;(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.Caucaia,Oil immersed transformerIf you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Dry type transformer factory


HonoluluPower Bureau transformerThe role of each component



With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.The efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the smaller the output power, the lower the efficiency.Loose core screwRecommendation and consultation,What about oil immersed transformer fire?The noise of dry-type transformer comes fromFor the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment, etc.


HonoluluPower Bureau transformerThe role of each component



The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.How much is it,After hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered coupled with the constraints of factors such as low threshold in the field,HonoluluInstallation requirements for distribution transformer bench, uneven companies, lack of evaluation and specifications, and inadequate technical innovation resulting in slow marketing of energy-saving transformers.Brief introduction of zero line of power transformerHonolulu,Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω The resistor is generally more than & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow,HonoluluHigh voltage bushing of oil immersed transformer, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words,Honolulu1600KVA price of power transformer, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.

404 Not Found

404 Not Found


nginx

Related articles

HonoluluPower Bureau transformerSales job highlights scan

HonoluluPower Bureau transformerSales job highlights scan

From the appearance, and only the shell can be seen for oil immersed transformer;Dry type transforme...

评论列表

984HP143755493
2022-03-08 08:54:19

HonoluluPower Bureau transformerYes, give you a good comment

570HP155642700
2022-03-08 07:59:10

HonoluluPower Bureau transformerYes, give you a good comment

122HP117294921
2022-03-08 08:15:49

HonoluluPower Bureau transformer The price is very high, and the quality is very good if you can buy it at such a price.

717HP127443542
2022-03-08 08:20:31

The level of the seller MM is very high, and the people are very patient. I saw a lot of HonoluluPower Bureau transformer, but I feel that you have the strength and bought yours. I didn’t expect it to be like this. Sellers like this are already online Rarely. I have asked a lot of sellers, but they can't do it, seller MM has done it. And the price is low. I am really happy.

709HP180518493
2022-03-08 08:14:21

Support each other! Seeing you HonoluluPower Bureau transformer, we are preparing to place an order and hope to ship on time.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。