GhentKaiserslauternIntroduction of common structural design

2024-04-06 01:09:36

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.Ghent,Limit switches should be triggered directly by the movement of the suspension cage or its related components.Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.Suihe City,Double layer steel mesh: The diameter of the steel bars is mm with a spacing of mm.During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed mm.When the door is closed, except for the gap between the lower part of the door that should not exceed mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, should comply with the provisions of Table of GB -.


GhentKaiserslauternIntroduction of common structural design



Model Example: Hanging Cage Specification: LABSC/TDx Type I: ~ Type II: ~ Type V: ~ Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x. (kN).The top of the hanging cage is accessible; d) During installation/disassembly/maintenance/inspection of the device; e) Inside the hanging cage.Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.Process inspection,When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective,GhentLiaoning, whether there is a lack of hydraulic oil,GhentProv,Ghentlubbock , and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.


GhentKaiserslauternIntroduction of common structural design



The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity,Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature dropsThe inner bearing of the roller in the device is in good condition, and a complete grease film surface is maintained between the curved surface of the roller and the main chord of the aluminum alloy electric elevator. A good grease film surface can reduce wear and noiseSetting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications record the inspection results, and report any problems found to the user unit.Ghent,The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.Installation and dismantling personnel and drivers should hold certificates to work.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.


404 Not Found

404 Not Found


nginx

Related articles

LeGros moonAdvantages of dry-type transformerBecome the industry's new normal

LeGros moonAdvantages of dry-type transformerBecome the industry's new normal

LeGros moonHow much is a 50 KVA box transformer,The tap changer of power transformer shall also have...

CongtaiElevating aluminum alloy ladderApplicable environment analysis

CongtaiElevating aluminum alloy ladderApplicable environment analysis

With the continuous development of society, for the increasingly widespread use of the internet,Cong...

La Concepción Transformer powerHuge infrastructure investment demand

La Concepción Transformer powerHuge infrastructure investment demand

When the whole process of winding wave of oil immersed transformer is calculated by using the markin...

MilwaukeePower transformer manufacturerRecent market starts have increased

MilwaukeePower transformer manufacturerRecent market starts have increased

When the new oil filled by the power transformer and the oil sample that has just been considered ar...

LamentinDry type transformer and oil immersed transformerTalk about the technical issues of installation and maintenance

LamentinDry type transformer and oil immersed transformerTalk about the technical issues of installation and maintenance

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to t...

Nejack4-meter hydraulic lifting platformIntroduction to the organization and working principle of

Nejack4-meter hydraulic lifting platformIntroduction to the organization and working principle of

The single column elevator is an indoor type, widely used for high-altitude operations in various in...

评论列表

161HP196399230
2024-04-06 09:33:04

GhentKaiserslautern Very good, I will order yours for the next batch.

47HP158935852
2024-04-06 08:25:48

Ask, can I send GhentKaiserslautern specific specifications, let me call you guys.

416HP186602172
2024-04-06 09:03:29

Happy cooperation, give your company support and wish business prosperous.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。