Makara42 * 4 small conduitInspection and maintenance of

2024-04-04 01:11:10
965HP113924865Building materials52

The grouting pipe is padded with the front lip of the horseshoe, and the height of the saddle shaped curved surface is changed to make the pipe wall crawl and slide along the accurate saddle shaped curved surface.In limestone area the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally when the grouting pipe is found blocked after the foundation pile is poured and before the inspection and even can not be detected. Therefore, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.MakaraConstruction sequence: remove the cement residue and attached floating soil on the foundation surface. Use vise to cut it pipe with proper length, and each loop is m according to the paper requirements. Put the outer layer of fabric into the blue horn interface to try the tensile property and confirm that it has been inserted to the end. The other end of the horn is sleeved with a PVC reinforced grouting pipe. It pipes shall be arranged according to the direction of construction joints, and installed mm away from the back water surface. Note that the green it pipe itself cannot be exposed to the concrete to be poured, and ensure that the PVC pipe is exposed outside the concrete for grouting in the future. Cement nail fixing clips or iron wires shall be used for fixing every other distance, it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.Attil,The grouting pipe diffuses the load on it. When the reinforced soil is loaded, the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, showing better tensile performance. The tensile stress of the soil is transmitted to the grouting pipe, making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, enhance the overall tensile strength of the soil, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil, greatly improving the bearing capacity of the soil. The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe. The grouting pipe is specially used as a channel for the depth detection of pile foundation and for structural stress calculation. The grouting pipe is a small pipe, but this small pipe meets the standard sensitivity of sound reception. As long as there is a small sound, it can measure it and accurately reflect the data on the computer or sound receiver. During the concrete pouring of cast-in-place pile, a channel that allows the ultrasonic probe to be normally placed at the pile bottom is reserved, which is not considered in the structural stress calculation.


Makara42 * 4 small conduitInspection and maintenance of



Welding is strictly prohibited during use, because the strength of the welding point is much lower than that of the steel itself, and it is easy to cause broken wires at the welding point during tensioning. When the grouting pipe adopts circular reinforcement arrangement, its bending radius shall not be less than times of the diameter. The quality of the steel upsetting head of the grouting pipe is not directly related to its own quality, but the excessive strength will be harmful to the quality of the upsetting head. Therefore, when you choose the upsetting head anchor, you should explain it in detail to the manufacturer in the order.The single liquid silicification method is applicable to reinforce collapsible loess with permeability coefficient of . ~ m/d and silty fine sand with permeability coefficient of . ~ m/d.Can the stretching speed of grouting pipe be defined?Quality inspection report,In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the roller rolls after it. The effect is good, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, and forbid vehicles to swerve, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water,MakaraGrouting hollow anchor manufacturer, and construction shall not be carried out in rainy days or wet roads; Glass fiber grouting pipe is made of grouting pipe, the temperature of the road surface is required to be between . Therefore, the relative displacement trend or relative displacement will occur between the narrow two, which will then generate friction. This friction is generally called 'surface friction'. The grouting pipe is a patented product. Compared with similar products in the market, and is also a grid like integral geo reinforced material, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, and the reinforcement is stable and uniform, which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material, which increases the stability of the project; The grouting pipe is especially suitable for the construction of high-speed highways, because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress, increase the deformation modulus of the soil, effectively enhance the strength of the soil, and achieve the effect of stabilizing the project and long-term use.


Makara42 * 4 small conduitInspection and maintenance of



The grouting pipe is padded with the front lip of the horseshoe, and the height of the saddle shaped curved surface is changed to make the pipe wall crawl and slide along the accurate saddle shaped curved surface.Excellent quality,Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage?Chemical grouting chemical grouting materials are mainly used in water glass and organic polymer grouting materials.It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in ChinaMakara,The glass fiber grouting pipe has the characteristics of easy construction, high temperature resistance,MakaraGrouting pipe leading small conduit, corrosion resistance, low elongation, high elastic modulus, no long-term creep, meeting the requirements of environmental protection, and has high tensile strength in the transverse and longitudinal directions. The strength to weight ratio of glass fiber is larger than that of steel, and the tensile strength can reach kn / m, which provides sufficient strength to prevent reflection cracks. When it breaks, its elongation is less than %, it has high deformation resistance and good compatibility with asphalt mixture. The grouting pipe is padded with the front lip of the horseshoe, and the height of the saddle shaped curved surface is changed to make the pipe wall crawl and slide along the accurate saddle shaped curved surface. The small editor of the grouting pipe reminds everyone that there should be no rust, water and other impurities when using the prestressed machinery. The working clip can be used after removing the foam in the packing box, and the grouting pipe should be properly kept. However, when the prestressed tendon is long and the grouting pipe needs to be tensioned repeatedly,MakaraAdvance small conduit tunnel, it is suggested that a small amount of lubricant (e.g. anchor pulling spirit) be applied to the tapered hole of the anchor plate by the prestressed machine, which is not only conducive to the follow-up and anchor pulling of the working clip, but also conducive to the multiple grouting of the grouting pipe; Apply lubricant on the outer surface of the tool clip and the inner and outer surfaces of the taper hole of the anchor plate before use, and regularly remove the debris on the clip surface to make the anchor flexible. However, when the clip is cracked or the tooth surface is damaged, it needs to be replaced and can not be used again.


404 Not Found

404 Not Found


nginx

Related articles

Makara42 * 4 small conduitInspection and maintenance of

Makara42 * 4 small conduitInspection and maintenance of

When the grouting pipe is laid, it shall be kept flat and tight without wrinkling, so that the grout...

评论列表

881HP198728332
2024-04-04 09:40:53

It's worthy of praise, really good, Makara42 * 4 small conduit I like it very much.

750HP120486450
2024-04-04 08:46:29

In anticipation, I finally waited for my beloved Makara42 * 4 small conduit, I wish the boss a prosperous business and wealth!

409HP184720764
2024-04-04 09:28:43

Makara42 * 4 small conduit The quality is very good, I bought it for the second time, the goods are good, the boss is very good

717HP127443542
2024-04-04 09:58:16

Makara42 * 4 small conduit How's the market trend recently, do you know anything?

632HP195506591
2024-04-04 09:37:01

Really a good seller. I have to find you if I have this Makara42 * 4 small conduit demand in the future!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。