HassertInstallation of small cold storage projectWeak demand and speculation failed to stimulate price rise

2024-03-29 03:33:57
632HP195506591energy44

The drainage at the outlet of the cooling fan, the drainage of the volatile cooler and the road drainage of the refrigerated warehouse storing food or drinks shall not be immediately connected with the sewage and wastewater pipeline system software, waterproof and corrosion resistance make it have better air resistance and water vapor resistance, and it can be made into inlaid connection structure during forming, which is easy to assemble. It does not need additional insulating layer to prevent moisture and saves a lot of trouble in laying insulating layer.Hassert,How to judge whether the controlled atmosphere storage is bad and the effect is poor? Under the same conditions, the required temperature can be reached in minutes, but now it takes minutes. In this way, the refrigeration is obviously slow and the effect is poor, which will directly affect the use cost.The overall construction achievements of the cold storage project have been put into use, and the service life can reach years.Lierre,During the installation of cold storage board in cold storage, its installation quality will directly affect the temperature of cold storage. As an important structure used in the cold storage, the cold storage board should pay attention to the details of its installation, find out the problems that are easy to be ignored, and avoid the wrong installation, so as to waste resources and increase the cost.Fault phenomenon: fan motor overload, fan deformation; Fan motor fault; Fan motor thermal relay fault (aging); Loose wiring; Cooler blocked; Large exhaust resistance. Cold storage fault phenomenon: dryer does not operate, compressor line is disconnected, fuse is blown, thermal relay acts, high voltage switch acts, compressor is locked, line is falsely connected or loose fault phenomenon: it stops in a short time after drying, ambient temperature is too high, condenser is blockedThe construction of cold storage in site selection bears the circulation of low-temperature goods. Therefore, the transportation convenience of cold storage construction site should be given priority in site selection, such as proximity to roads, railways, etc. At the same time, the location of the cold storage should avoid large pollution sources and direct sunlight, and the construction of the cold storage should have good drainage and ventilation conditions.


HassertInstallation of small cold storage projectWeak demand and speculation failed to stimulate price rise



After being stored in the medical cold storage project, ventilating medical products may also emit some odors. Once these odors are stored in a certain quantity, they will also have a certain impact on other products. Therefore, we must carry out regular ventilation in the process of daily use, so as to effectively reduce the storage time of products. If the medical cold storage project uses row tube refrigeration, the image of frosting may appear after use for a period of time. If we do not defrost in time, it will also affect the effect of. Therefore, I hope you must pay attention to defrosting.The stacking and arrangement of cargo stacks in the controlled atmosphere warehouse have a great impact on the air circulation. A basic principle of air flow is to take the path with low resistance to obtain large air flow. If there is a dead corner caused by stacking obstruction and air circulation is difficult, the temperature will rise. For this reason, there shall be gaps between the cargo stacks and between the cargo stacks and the wall. The stacking arrangement of the cargo stacks shall be coordinated with the ventilation arrangement.Installation of unit electrical box: the unit electrical box shall be installed near the unit; Vertical installation. If the unit is installed on the top of the warehouse, the distance between the box bottom and the top of the warehouse must be & amp; gt; mm; The electrical box can be fixed on the building wall or on the angle steel frame.Create brilliance, which has the advantages of low temperature resistance which can effectively meet the refrigeration capacity of the refrigerator and ensure the refrigeration effect of the refrigerator. The refrigerator lamp adopts the special LED energy-saving lamp for the refrigerator, low energy consumption and long service time, It can effectively save the operation cost of cold storage.There are two kinds of refrigeration in the cold storage group: immediate refrigeration and simple refrigeration.The drainage at the outlet of the cooling fan the drainage of the volatile cooler and the road drainage of the refrigerated warehouse storing food or drinks shall not be immediately connected with the sewage and wastewater pipeline system software,HassertFreezer manufacturer, but indirect drainage shall be adopted. For the flushing (thawing) water drainage of each layer in the double-layer cold storage, an exhaust valve equipment shall be set in front of the main riser for flushing (thawing) water drainage.


HassertInstallation of small cold storage projectWeak demand and speculation failed to stimulate price rise



Installation of unit electrical box: the unit electrical box shall be installed near the unit; Vertical installation. If the unit is installed on the top of the warehouse, the distance between the box bottom and the top of the warehouse must be & amp; gt; mm; The electrical box can be fixed on the building wall or on the angle steel frame.Which one is better,Reasonable space: the power consumption of the cold storage is calculated according to the cold consumption of the cold storage, which usually includes two parts: the cold consumption during cargo cooling and refrigeration; It is the cooling consumption of the refrigeration room itself and operation management.Ammonia filling leak test: ammonia filling leak detection can be carried out after system blowdown and pressure leak test. The purpose is to improve the air tightness of the system and lay a good foundation for the work of ammonia filling and thermal insulation materials of the system. After air leakage detection some obvious leakage points can be found. However, due to the poor air permeability, the leakage points blocked by dirt along the tiny sand holes are not easy to be detected. Therefore, ammonia must be filled. In addition to good permeability, ammonia also has odor and is easy to be found, At the same time, phenolphthalein test paper can be used for leak detection because it is rose red in the presence of ammonia.Cold storage, compressor overload, lack of refrigerant, low pressure too low excessive air intake, compressor jamming.Hassert,HassertPharmaceutical plant,The lights in the warehouse are not on. Please check whether the switch fails and whether the bulb is damaged. Cut off the power supply when installing the lampshade,HassertCold storage installation manufacturer, and pay attention to the waterproof of the lamp.The equipment that needs to be installed in the warehouse and put into the warehouse shall be installed in place or placed in an appropriate position in the warehouse; The wall warehouse board shall be installed from the corner of the warehouse body, and the professional cold warehouse shall be installed. The cold warehouse shall be installed. The cold warehouse shall be constructed. The fruit fresh-keeping cold warehouse and medical cold warehouse shall have high pressure rating, good waterproof performance, fire and high temperature resistance strong overload capacity, corrosion resistance, radiation protection and long service life. The corner shall be temporarily fixed with . color plate angle steel; When installing each wall panel, evenly apply two layers of foaming material on the joint surface of male and female groove, and apply one layer of foaming material when installing polystyrene wall panel. The blanking shall be uniform and continuous; After the wallboard is installed in place, pull rivets at the lap joint of the internal and external steel plates of the two wallboards for connection and fixation, and the rivet spacing in the warehouse should be mm; When connecting the library plate in the form of eccentric hook connection, the eccentric hook shall be loosened once before installation to ensure reliable locking during installation.Requirements for refrigeration equipment in quick freezing warehouse: the strict sealing of quick freezing warehouse is obviously different from that of ordinary quick freezing warehouse. Therefore, all through wall pipelines must be equipped with sleeves, the frost flushing water return pipeline must be equipped with U-shaped bend water seal, and the main frost flushing and return pipeline outside the warehouse shall be equipped with air filling port to prevent the gas in the warehouse from being pumped out of the warehouse by negative pressure. In addition, due to the good sealing of the quick freezing warehouse, the set fluctuation range of the warehouse temperature should not be too large to prevent excessive positive and negative pressure from damaging the warehouse body.

404 Not Found

404 Not Found


nginx

Related articles

Pueblo, New MexicoInstallation of small freezerWhat is the content of detection

Pueblo, New MexicoInstallation of small freezerWhat is the content of detection

The foundation of cold storage is affected by low temperature, and the water in the soil is easy to...

BiniaresCold storage professional installationEnterprise products

BiniaresCold storage professional installationEnterprise products

Wall and floor fixtures shall start at corners. According to the plate layout drawing, transport the...

NorfolkWhat are the cold storage installation companiesWhat problems are encountered in use

NorfolkWhat are the cold storage installation companiesWhat problems are encountered in use

With the development of the times, refrigeration devices are becoming more and more common. All aspe...

IbisMedical cold storageNew record production

IbisMedical cold storageNew record production

Moreover, polyurethane does not produce harmful gas at high temperature.Stretch perlite: stretch per...

HerazbergGeneral cold storage installationPerformance characteristics used in Enterprises

HerazbergGeneral cold storage installationPerformance characteristics used in Enterprises

Core tip: in the cold storage project, only with sufficient cold storage installation skills can we...

Medellin Refrigerated and frozen drug transportationMatters to promote scientific and Technological Development

Medellin Refrigerated and frozen drug transportationMatters to promote scientific and Technological Development

In the cold storage project, the selection of cold storage is related to the overall operation of co...

评论列表

881HP198728332
2024-03-29 11:43:26

It's worthy of praise, really good, HassertInstallation of small cold storage project I like it very much.

938HP166090698
2024-03-29 11:19:20

One word! ! value! ! ! The service attitude is really good, HassertInstallation of small cold storage project delivery is fast. The quality of the goods is also quite good. I like it so much, thank you.

750HP120486450
2024-03-29 10:52:34

HassertInstallation of small cold storage project It was posted very quickly, really timely, please give me a thumbs up

965HP113924865
2024-03-29 12:33:00

Happy cooperation, give your company support and wish business prosperous.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。