San Pedro sacartepexGrouting pipe groutingChange for development

2024-02-27 01:41:08
965HP113924865Building materials54
the gap is larger than the thickness of the pipe wall, that is, there is an active gap. Therefore, the Chengdu grouting pipe manufacturer kneads the pipe wall to form an 'eight' shaped wrinkle.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistanceSan Pedro sacartepex, According to the experimental results, optimize the specific parameters and determine the grouting materials and pressure. Cement grouting material cement slurry ordinary portland cement is the most commonly used cement grouting material. Its advantages are: wide source of raw materials, low cost, non-toxic, simple and convenient construction process. The disadvantages are: poor stability of cement slurry, easy precipitation and water precipitation, long setting time, and because of the large diameter of cement particles, the injection capacity is often limited to micro cracks []. It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.Bolobo,The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission, so there is generally no need to restrict the thickness of the pipe wall. However, it is OK if the pipe wall can bear the lateral pressure of new concrete, not necessarily the thicker the better.Can the stretching speed of grouting pipe be defined?Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistance


San Pedro sacartepexGrouting pipe groutingChange for development



It has good air tightness, low gas permeability, strong sealing and no leakage.[] when the utility model is in use, the flange plate is used to fix the utility model and the flange plate of the underground grouting pipe,San Pedro sacartepexHollow self-propelled anchor rod manufacturer, the bolt is rotated with a tool, the cutting blade is adjusted to a certain position by the screw on the bolt, and then fixed, and then the screw cap of the blade is rotated and tightened to make the cutting blade and the pulley contact the inner surface of the grouting pipe with a certain contact force, that is, neither loose nor tight. The cutting blade and the pulley are directly inserted into the concave groove of the rotating device through the slot, and the cutting rotating device is fastened and rotated by a wrench or a tooth wrench, and the pulley and the blade are driven to rotate by the rotation of the bolt, thereby rotating the casing. The pulley is located on the other side of the rotating device, corresponding to the blade. It is mainly used to reduce the friction between the rotating device and the casing wall and fix the position of the blade in the casing, failing to achieve the cutting purpose, so as to drive the pulley and blade to rotate. The cutting rotating device cuts the casing. When the casing is cut to a certain depth, the blade nut is tightened again and the cutting continues until the casing wall is cut through. It has the characteristics of - times higher work efficiency than manual cutting and lower labor intensity of workers.How to deal with the joint if the grouting pipe is installed in sections? If the grouting pipe is installed in sections, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant, and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap.After checking that the installed formwork is tight and seamless, clean the reserved groove, then pour concrete and vibrate it tightly. The concrete shall have at least the same strength as the structural concrete at this place,It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove, so that the center line of the joint coincides with the center line of the actual reserved joint and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place the top surface of its steel beam shall be adjusted according to the longitudinal, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation.Disposal method: the grouting pipe shall be shortened according to the specification.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.


San Pedro sacartepexGrouting pipe groutingChange for development



Among the many imported projects, the development of the production technology of automobile door and window sealing strips is the most representative. Through the introduction of sealing strip production lines from Japan, Germany, Italy, Britain and other countries, sealing strips of various composite structures domestic manufacturers have introduced more than sealing strip production lines. In addition to pure rubber sealing strips, metal skeleton and various rubber composite sealing strips,San Pedro sacartepexSmall catheter, rubber and plastic composite sealing strips can be produced. At present, the overall level of China&#;s sealing strip production technology has basically reached the level of foreign countries in the s, and has become a grouting pipe. Because some projects are not easy to detect when they are manufactured, and the quality of the grouting pipe as a channel for testing instruments has become crucial. If the quality of the grouting pipe is poor, it will bring many hidden dangers. Steel grouting pipe material, which has the characteristics of thin pipe wall, steel saving, impermeability, pressure resistance and high strength, is generally used for post tensioned reserved holes in prestressed structures. When the grouting pipe is used, it can be directly bound to the reinforcement framework. Because the grouting pipe is very light, it is very convenient to operate. However, attention should be paid to the balance of its axis during installation.query,A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough.The installation will not affect the characteristics of the building grouting pipe itself; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; If there is no leakage, grouting is not allowed; Ccll-y series grouting pipe: grouting once, not reusable ccll-d series grouting pipe: multiple times of grouting, grouting is not limited by time.It is applicable to waterproof joints of subway, tunnel and basement. If there is water leakage, grout can be injected into the pipe body to fill and seal. It is very suitable to install grouting pipes between the joints of new and old concrete. Various materials such as cement slurry, polymer slurry and polyurethane chemical slurry can be injected. When water penetrates into the joint, the joint can be sealed by injecting slurry into the PVC port or spring skeleton port set on the surface. The proper grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way. It has good flexibility. The pipes can be coiled when they are produced, so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, and is convenient for construction.San Pedro sacartepex, The small editor of the grouting pipe reminds everyone that there should be no rust, water and other impurities when using the prestressed machinery. The working clip can be used after removing the foam in the packing box, and the grouting pipe should be properly kept. However, when the prestressed tendon is long and the grouting pipe needs to be tensioned repeatedly, it is suggested that a small amount of lubricant (e.g. anchor pulling spirit) be applied to the tapered hole of the anchor plate by the prestressed machine, which is not only conducive to the follow-up and anchor pulling of the working clip but also conducive to the multiple grouting of the grouting pipe; Apply lubricant on the outer surface of the tool clip and the inner and outer surfaces of the taper hole of the anchor plate before use, and regularly remove the debris on the clip surface to make the anchor flexible. However, when the clip is cracked or the tooth surface is damaged, it needs to be replaced and can not be used again.However, not all grouting pipe products can achieve this effect. Some inferior grouting pipe products not only fail to achieve the expected effect in use, but also have problems such as low grouting efficiency, pipe burst and pipe bending, which seriously affect the grouting effect of the grouting pipe and the progress of the whole project. The quality of grouting effect comes from the selection of high-quality grouting pipe products. Shengpeng grouting pipe is a good choice for you to choose grouting pipe products because of its high strength, awesome, simple connection and high cost performance! Grouting pipe the grouting pipe is a kind of geosynthetic material formed by ultrasonic welding, which is composed of a steel plastic composite reinforced belt (built-in high-strength carbon spring steel wire (stress material) and wrapped with polyethylene resin (protective material) and arranged at right angles to the plane longitude and latitude. It is a comprehensive product of existing rigid reinforcement (flat steel strip, ribbed steel strip, galvanized steel strip, stainless steel strip, reinforced concrete strip, etc.) and flexible reinforcement (polypropylene strip, plastic grouting pipe, warp knitted grouting pipe, etc.). Because of its high tensile strength, small creep, and strong interlocking and occlusive effect on the soil, it can effectively treat the soft soil foundation, restrict the lateral displacement of the soil, overcome the uneven settlement of the soil, greatly enhance the bearing capacity of the foundation and improve the overall performance of the foundation; It can be widely used in road engineering, railway engineering, retaining structure, dam engineering, water conservancy engineering and tunnel engineering; It has remarkable safeguard effect and good social and economic benefits against rutting and pavement cracking.In the construction of some grouting pipes after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes,San Pedro sacartepex32lead small conduit, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.


404 Not Found

404 Not Found


nginx

Related articles

San Pedro sacartepexGrouting pipe groutingChange for development

San Pedro sacartepexGrouting pipe groutingChange for development

The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the m...

评论列表

47HP158935852
2024-02-27 09:17:16

It is very comfortable to do business with you. Responsible, serious, San Pedro sacartepexGrouting pipe grouting is also good, I must give you a good comment. Looking forward to the next cooperation, I wish Rijin Doujin!

224HP159430236
2024-02-27 10:12:05

Every time I receive the goods is very pleasant, but as long as I think of evaluating it, my head is big. Fortunately, a omnipotent friend recommended your home San Pedro sacartepexGrouting pipe grouting, the price is good, the quality is good, the delivery is good, and the boss is good.

60HP184127502
2024-02-27 09:50:30

San Pedro sacartepexGrouting pipe grouting It’s really good, how long does it take to arrive after the departure?

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。