ProsekSpot inspection standard for dry type transformerTo inject fresh blood

2023-05-10 01:22:34
the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.When the transformer is put into operation,ProsekPower transformer energy consumption standard, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.Prosek,At that time, and the market share of high-voltage transformers was basically monopolized by overseas leaders.Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.Kratovo,When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules,ProsekPrice of 5000KVA transformer, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.Analysis of common faults of oil immersed transformer:The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.


ProsekSpot inspection standard for dry type transformerTo inject fresh blood



The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is resistant to corrosion and rust, and has sound insulation and noise reduction.Precautions for trial operation of power transformer manufacturersFor example in the s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.Recommendation and consultation,On load commissioning:How to reduce the failure of dry-type transformer?When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,


ProsekSpot inspection standard for dry type transformerTo inject fresh blood



(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.recommend,Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.Several detection methods for installing transformerThe power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe,ProsekDry type transformer protection configuration, and between the electromagnetic coil and the tap changer.Prosek,The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.

404 Not Found

404 Not Found


nginx

Related articles

UlmScrew type household elevatorHow to be more controllable

UlmScrew type household elevatorHow to be more controllable

Measurement of elevator and escalator shafts (III)Attention: The elevator consists of two main parts...

NangongVarnaReasonable operation and guarding

NangongVarnaReasonable operation and guarding

Setting requirements: The landing door should be standardized and tooled.Tank oil temperature protec...

NassauPower plant step-up transformerIs the price cheap?

NassauPower plant step-up transformerIs the price cheap?

After the oil is drained all anchor bolts of the automobile oil tank at the upper end of the detacha...

DongshengPlatform operation elevatorWelcome to large quantity discount

DongshengPlatform operation elevatorWelcome to large quantity discount

Nowadays, electric elevators are not only used in factories or construction sites, many people are n...

WuyiSimple hydraulic lifting platformThe problem of incentive technology

WuyiSimple hydraulic lifting platformThe problem of incentive technology

The design of the power unit is good. Most of the power units of guide rail electric elevators have...

Waze1 ton hydraulic lifting platformWhat principles should be paid attention to in the selection

Waze1 ton hydraulic lifting platformWhat principles should be paid attention to in the selection

The transportation equipment for lifting and unloading goods is mostly used for goods transportation...

评论列表

779HP136589660
2023-05-10 09:17:45

Although ProsekSpot inspection standard for dry type transformer has not yet arrived, I am looking forward to it, and the inquiry is still in transit.

984HP143755493
2023-05-10 08:53:39

Yes, I hope to cooperate next time. Thank you boss~~ Fast delivery, ProsekSpot inspection standard for dry type transformer basically satisfied.

122HP117294921
2023-05-10 09:07:23

I'm quite satisfied, and the quality and workmanship are even worse. Look back and introduce to friends

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。