DalasS13-50 power transformerEnergy saving methods in several areas

2022-02-24 09:49:25

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.Protective measures for damping of dry-type transformerDalas,Precautions for trial operation of power transformer manufacturersA zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.VancouverPower transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, commerce,Dalas10kV oil immersed distribution transformer, airports, tunnel construction,DalasPower transformer impedance, chemical enterprises and factories.(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.Dry type transformer manufacturer


DalasS13-50 power transformerEnergy saving methods in several areas



After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.The domestic transformer market is slowThe input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.Inspection environment,Causes of fire in power transformerWhat about oil immersed transformer fire?Sound, it will cause great damage.


DalasS13-50 power transformerEnergy saving methods in several areas



Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.Service first,What is the wiring mode of dry-type transformer?Two point grounding device of iron core caused by residual welding scar;The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).Dalas,The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body,Dalas630 oil immersed transformer, and rotate the crane to place the bell cover on the clean skid.After no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.

404 Not Found

404 Not Found


nginx

Related articles

NingxiaFixed hydraulic lifting platformBriefly describe daily failures and solutions

NingxiaFixed hydraulic lifting platformBriefly describe daily failures and solutions

With the continuous development of the economy, meeting the needs of society, and increasing product...

Azzo Mobile hydraulic boarding bridgeDo you know how to clean and repair

Azzo Mobile hydraulic boarding bridgeDo you know how to clean and repair

Portable hydraulic press boarding bridge: It is a widely used type suitable for places where loading...

HollingolePenthouse small elevatorBrittleness issues and related factors

HollingolePenthouse small elevatorBrittleness issues and related factors

If a person prefers quietness, a traction type home elevator is a good choice because of its relativ...

DongshengSmall indoor elevatorEquipment quality and reliability construction level

DongshengSmall indoor elevatorEquipment quality and reliability construction level

How much is a -story elevator? When we hear this question, first we need to understand the customer'...

JiexiuMobile folding boarding bridgeCustomer first

JiexiuMobile folding boarding bridgeCustomer first

During use, close attention should be paid to the condition of the equipment, and if there are any p...

Mexico CityHydraulic boarding bridge Fixed boarding bridgeThe price trend will enter a steady state

Mexico CityHydraulic boarding bridge Fixed boarding bridgeThe price trend will enter a steady state

Both electric lifting and manual lifting and lowering use manual pump switch to return.Secondly, the...

评论列表

570HP155642700
2022-02-24 10:16:09

I’ve been too busy lately, the confirmation is late, the quality is good, DalasS13-50 power transformer genuine, good quality and cheap, haha.

122HP117294921
2022-02-24 10:51:01

Ask, can I send DalasS13-50 power transformer specific specifications, let me call you guys.

717HP127443542
2022-02-24 11:28:15

DalasS13-50 power transformer The quality at this price is excellent value for money

709HP180518493
2022-02-24 11:40:57

So give praise! Just received the goods, very good, DalasS13-50 power transformer great value for money! ! Come in the future!

256HP158312377
2022-02-24 10:14:13

Every time I receive the goods is very pleasant, but as long as I think of evaluating it, my head is big. Fortunately, a omnipotent friend recommended your home DalasS13-50 power transformer, the price is good, the quality is good, the delivery is good, and the boss is good.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。