HaitiSupplied by dry-type transformer manufacturerCommon sense of product selection

2022-10-12 16:08:29

The no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer, the closing frequency shall be times, the delay time after power receiving shall not be less than min, and the time interval of each closing shall not be less than min.In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection,Haiti1600KVA dry type transformer size, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.Haiti,The transformer manufacturer said that the selection should be based on the application environment of the dry-type transformer. For the extremely extreme environment, the dry-type transformer should be poured with epoxy resin glue. Because this kind of environment does not need to heat the dry-type transformer, it can operate immediately. However, for the general application environment, the class H dry-type transformer can be used.kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.Tokar,For example in the s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.Avoid the load operation of power transformer: if the load operation is long-term, slow aging of insulation, two-color short circuit fault or short circuit to ground fault and dissolution of oil.


HaitiSupplied by dry-type transformer manufacturerCommon sense of product selection



Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut),HaitiTransformer oil immersed, wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying,HaitiMain components of box transformer, the treatment goal can be achieved.During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.plan,The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.In specific daily life, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the greater the output power is. On the contrary, it is very small.


HaitiSupplied by dry-type transformer manufacturerCommon sense of product selection



Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.Variable cost,When the full load test is carried out and everything is normal, the load can be connected.For oil transformer oil replenishment, unused transformer oil conforming to the new standard should be selected first. In addition the oil with the same basic, same brand and same additive type is expected to have a stronger effect. The characteristics of the oil should not be lower than that of the oil in mechanical equipment. When the new remaining oil is less than %, there is generally no problem. However, if there is more new remaining oil, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.Haiti,The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

404 Not Found

404 Not Found


nginx

Related articles

HaitiSupplied by dry-type transformer manufacturerGood and bad coexist, what is the trend of the market outlook

HaitiSupplied by dry-type transformer manufacturerGood and bad coexist, what is the trend of the market outlook

There are many connection groups of dry-type transformers, and the selected structures and connectio...

评论列表

466HP159575805
2022-10-12 16:44:35

Thank you faithfully, let me buy the dream HaitiSupplied by dry-type transformer manufacturer, thank you so much!

416HP186602172
2022-10-12 17:13:17

I’m really sorry.

263HP145816628
2022-10-12 18:04:11

Yes, I hope to cooperate next time. Thank you boss~~ Fast delivery, HaitiSupplied by dry-type transformer manufacturer basically satisfied.

717HP127443542
2022-10-12 17:30:48

I finally waited until I bought it HaitiSupplied by dry-type transformer manufacturer. At first, I was still wondering whether to buy it. I liked it a little bit. I was a little scared to read the comments. I was afraid that the quality was not good. It was not a genuine product. It was a bit different from the picture. However, everything is wrong, the things are good, authentic, the boss is good, and the logistics are good.

256HP158312377
2022-10-12 16:26:55

Support each other! Seeing you HaitiSupplied by dry-type transformer manufacturer, we are preparing to place an order and hope to ship on time.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。