Giguani160KV oil immersed transformerNew toughening technology

2022-05-25 00:19:30

After hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.GiguaniWhen the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil, it is also necessary to carry out high and low temperature test and sludge test, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m,GiguaniRanking of box transformer manufacturers, and a guardrail of no less than m shall be installed around it and a warning sign shall be hung at a prominent position.Meifang City,(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it,GiguaniThree winding power transformer, and a warning sign shall be hung at a prominent position.Noise pollution control and prevention measures of dry-type transformerFrom the appearance the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;


Giguani160KV oil immersed transformerNew toughening technology



Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.The grounding resistance of, high voltage and bottom voltage shall not be less than % (m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed %, which shall not exceed % compared with the last accurate measurement result.The method and whole process of taking oil sample of power transformer are as follows:High quality brand,After no-load test run is normal for h, and the load shall be gradually increased from %, % and % by grade.Dry type transformer manufacturerSound in case of phase failure


Giguani160KV oil immersed transformerNew toughening technology



Under normal conditions, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.Installation conditions,Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, it shall be handled properly.Precautions for trial operation of power transformer manufacturersThe voltage regulating tap changer is not in place or poorGiguani,For no-load impulse closing of transformer, pay attention to the following matters:The switching power supply lacks one phase of power;The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

404 Not Found

404 Not Found


nginx

Related articles

Hu GewenSmall electric hydraulic lifting platformHow to solve product shortcomings

Hu GewenSmall electric hydraulic lifting platformHow to solve product shortcomings

It is necessary to regularly inspect the brake of the guide rail type cargo elevator, and there shou...

HuanghuaSmall cargo elevatorCommon faults and solutions

HuanghuaSmall cargo elevatorCommon faults and solutions

The principle of throttling introduces that under the same braking conditions, the buffering effect...

BischofenPower transformer specificationThe industry is facing development opportunities

BischofenPower transformer specificationThe industry is facing development opportunities

wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials...

EscasuComplete list of Transformer ModelsLow impact toughness

EscasuComplete list of Transformer ModelsLow impact toughness

including the vibration of magnetic induction electromagnetic coil. All pay great attention to the...

malpensa airport Hydraulic platform lifting platformAnalysis of industry emerging market representatives

malpensa airport Hydraulic platform lifting platformAnalysis of industry emerging market representatives

Fixed lifting platforms are generally used to transport a large amount of goods, but due to the larg...

LecceAluminum alloy double mast elevatorManagement System Research

LecceAluminum alloy double mast elevatorManagement System Research

There are many factors that affect the price difference of aluminum alloy elevators, possibly due to...

评论列表

984HP143755493
2022-05-25 07:35:01

Since the last time I bought your Giguani160KV oil immersed transformer, this new model has indeed met the standard and is very good, giving you a good comment.

709HP180518493
2022-05-25 08:23:13

Since the last time I bought your Giguani160KV oil immersed transformer, this new model has indeed met the standard and is very good, giving you a good comment.

256HP158312377
2022-05-25 08:54:15

Giguani160KV oil immersed transformer The quality at this price is excellent value for money

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。