San Antonio de Los BanosTotally enclosed oil immersed transformerUse and maintenance
2022-05-24 00:59:46Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.San Antonio de Los Banos,With Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;Incheon International Airport ,Naturally if the oil immersed transformer catches fire,San Antonio de Los BanosPower recovery transformer, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.
After no-load test run is normal for h, it can be transferred to on-load operation and the load shall be gradually increased from %, % and % by grade.Automatic system of centrifugal fan: measure the temperature data signal according to the PT thermistor temperature measuring resistor of the embedded parts at the hot part of the bottom pressure winding. The transformer load expands and the operating temperature increases. When the winding temperature reaches ℃, the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as ℃, the system software will automatically terminate the centrifugal fan.Power transformer factoryThe cost is reasonable,If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl,San Antonio de Los BanosPrice of 100 KVA dry type transformer, the insulation resistance from the secondary side to the ground should be ^ mh and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary,San Antonio de Los BanosTransformer 2000 KVA, the load can be reduced or the operation of the transformer can be stopped.Careless maintenance and insulation damage
The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, the dispersion spacing and adverse effects are very large.reform,Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.Visual inspection method for transformer inspectionSolenoid insulation deteriorationSan Antonio de Los Banos,Oil leakage of heat pipe radiatorHow to reduce the failure of dry-type transformer?Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.