ArubaGrouting pipeFailure cause analysis and improvement measures

2023-01-11 02:10:45
965HP113924865Building materials198

They shall be connected as a whole in the factory as far as possible. If it is necessary to connect on site due to manufacturing process, transportation conditions, etc. hot press vulcanization (grouting pipe) or welding (plastic grouting pipe) shall be used. The joint appearance shall be smooth and smooth, and the tensile strength shall not be less than % of the base metal. The so-called 'overlapping' without any treatment is absolutely not allowed. All kinds of cross connection points of grouting pipes shall be made of accessories produced by our new rubber products factory, so as to ensure that on-site connection is only carried out in straight sections during construction. Flexible material with sufficient deformation capacity and good adhesion with concrete.In the construction of some grouting pipes, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.Aruba, Provide considerate service, solve customer problems, and realize one-stop procurement.How heavy is a grouting pipe?Bekescsaba,When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Common problems and answers of grouting pipe what is the pressure inside the grouting pipe?The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head,ArubaAdvance small conduit tunnel, and the size matches the flange of the Christmas tree wellhead.The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, on the surface of the soil mass or between the layers of soil mass. Relying on the tensile characteristics of the grouting pipe, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass.


ArubaGrouting pipeFailure cause analysis and improvement measures



How to deal with the joint if the grouting pipe is installed in sections? If the grouting pipe is installed in sections, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant, and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap.After checking that the installed formwork is tight and seamless, clean the reserved groove, then pour concrete and vibrate it tightly. The concrete shall have at least the same strength as the structural concrete at this place, and the grouting pipe device in Hainan shall be kept clean when pouring concrete. According to the sequence of sectional construction along the stratum depth, grouting can be divided into sectional downward, sectional upward and one-time full depth grouting. The segmented downward type starts from the ground, and injects a section of grout. After each section of grouting, the drilling and grouting continue to be continued downward, so as to alternately reach the designed final grouting depth, and then carries out re grouting from bottom to top; The segmented upward type is that the grouting hole is drilled to the final grouting depth at one time, and the grouting is segmented from bottom to top using a grout stopper; The method of one-time full depth grouting is to drill the grouting hole to the final grouting depth at one time, and then conduct one-time grouting to the full depth.The grouting pipe diffuses the load on it. When the reinforced soil is loaded the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, enhance the overall tensile strength of the soil, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil, greatly improving the bearing capacity of the soil.Sampling inspection,The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, on the surface of the soil mass or between the layers of soil mass. Relying on the tensile characteristics of the grouting pipe, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded,ArubaLeading small conduit manufacturer, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile. The length can be matched according to the construction requirements, without loss.


ArubaGrouting pipeFailure cause analysis and improvement measures



The quality of the steel upsetting head of the grouting pipe is not directly related to its own quality,ArubaAdvance small conduit and pipe shed, but the excessive strength will be harmful to the quality of the upsetting head. Therefore, when you choose the upsetting head anchor, you should explain it in detail to the manufacturer in the order. The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end, which significantly reduces its performance. During the use of the grouting pipe, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe.High quality and low price,In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the roller rolls after it. The effect is good, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, and forbid vehicles to swerve, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water, and construction shall not be carried out in rainy days or wet roads; Glass fiber grouting pipe is made of grouting pipe, which is easy to irritate human skin. Construction personnel must wear protective gloves; When the grouting pipe is laid, the temperature of the road surface is required to be between . Therefore, the relative displacement trend or relative displacement will occur between the narrow two, which will then generate friction. This friction is generally called 'surface friction'.Features of reusable grouting pipe: with one-way switch . Good anti blocking property and no backflow of slurry. It has good air tightness, low gas permeability, strong sealing and no leakage.Aruba,Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?The grouting pipe with the grouting pipe as the core flexible element can be compensated in the axial, lateral and angular directions on the pipeline. From the perspective of its performance the internal pressure grouting pipe can be displaced in three directions, but because it is limited by casing and other accessories, it can often only be displaced in the axial direction. Therefore, the user needs to indicate the displacement in several directions when selecting and ordering so as to select correctly. The working principle of the grouting pipe is to use its own elastic deformation to compensate the axial, angular, lateral and combined displacement of the pipe due to thermal deformation, mechanical deformation and various mechanical vibrations. The compensation has the s of sealing, pressure resistance, temperature resistance, corrosion resistance, impact resistance, vibration reduction and noise reduction, which can reduce the deformation of the pipe and improve the service life of the pipe.


404 Not Found

404 Not Found


nginx

Related articles

ArubaGrouting pipeFailure cause analysis and improvement measures

ArubaGrouting pipeFailure cause analysis and improvement measures

The grouting pipe is used to pad the bottom of the horseshoe, change the cooperation specification...

评论列表

35HP162657470
2023-01-11 10:45:51

The logistics is very fast, look forward to working together again

570HP155642700
2023-01-11 09:28:57

ArubaGrouting pipeHow much is it, can I transfer the goods?

717HP127443542
2023-01-11 10:46:04

ArubaGrouting pipe It was posted very quickly, really timely, please give me a thumbs up

632HP195506591
2023-01-11 10:30:19

This store is really good, with good quality and low price, the owner is very generous, and the customer service is also very patient. I don’t understand this ArubaGrouting pipe. They explain to me patiently. It is really the conscience of the industry. I want to recommend this shop to my friends and let them all come to this shop to buy clothes!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。