San FrancoisAdvance support small conduitProblems needing attention in season use

2024-01-26 02:39:29
965HP113924865Building materials63

Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistanceCan the stretching speed of grouting pipe be defined?San Francois,During high-pressure grouting, the water stop needle is used from top to bottom along the crack at an angle of degrees, about cm to the left and right. The straight-line distance between the two water stop needles is about cm. If the crack is too large, it can be directly drilled vertically to the crack.The grouting pipe at the tensioning end has good anchoring energy and self anchoring energy. Grouting pipe is generally used for tensioning. The grouting pipe at the tensioning end is composed of four parts: clip anchor plate, anchor base plate and spiral reinforcement. The clip is the key part of the anchoring system. It is two-piece and made of high-quality alloy steel.Loandjili,Answer: Yes, it can be protected. The piston rod can be protected by adding plastic hoses or bellows within the travel range.In the construction of some grouting pipes, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.There are many forms of grouting pipes that can be improved and applied. Although the engineering pipeline system is very complex, any complex pipe system can be divided into several relatively simple individual pipe sections through the setting of fixed pipe racks. When selecting the corrugated grouting pipe, so as to select the grouting pipe.


San FrancoisAdvance support small conduitProblems needing attention in season use



The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the mold, the space between the outer mold and the horseshoe surface is greater than the thickness of the pipe wall. The multiple grouting pipes are fully combined with two as a detection profile, and the detection is completed for multiple profiles respectively.The quality of the steel upsetting head of the grouting pipe is not directly related to its own quality, but the excessive strength will be harmful to the quality of the upsetting head. Therefore, when you choose the upsetting head anchor, you should explain it in detail to the manufacturer in the order. The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end, which significantly reduces its performance. During the use of the grouting pipe, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe.Trustworthy, It has good air tightness, low gas permeability strong sealing and no leakage.It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found,San Francois50lacrimal duct, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove, so that the center line of the joint coincides with the center line of the actual reserved joint, and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place, the top surface of its steel beam shall be adjusted according to the longitudinal,San FrancoisAdvanced small conduit processing, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation. The grouting pipe is specially used as a channel for the depth detection of pile foundation and for structural stress calculation. The grouting pipe is a small pipe, but this small pipe meets the standard sensitivity of sound reception. As long as there is a small sound, it can measure it and accurately reflect the data on the computer or sound receiver. During the concrete pouring of cast-in-place pile, a channel that allows the ultrasonic probe to be normally placed at the pile bottom is reserved, which is not considered in the structural stress calculation.


San FrancoisAdvance support small conduitProblems needing attention in season use



Low cost, fast time, no loss,The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?Ceramic process : make and process gypsum molds according to the requirements of a certain place.Answer: it varies according to the model and elasticity of the grouting pipe,San Francoismanufacturer of composite anchor rod, and its internal pressure can reach bar or more.San FrancoisThe existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness. It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.


404 Not Found

404 Not Found


nginx

Related articles

Mason AlfordSimple cargo elevator lifting cargo elevatorIndustry price fluctuations

Mason AlfordSimple cargo elevator lifting cargo elevatorIndustry price fluctuations

Goods should be stacked on the platform and not tilted. When the freight elevator goes up and down b...

CalgaryHow much is 50 galvanized pipeExplain the principle issues to be considered in the design

CalgaryHow much is 50 galvanized pipeExplain the principle issues to be considered in the design

X-ray or ultrasonic testing shall be carried out for repair welding of alloy pipe dead end welding o...

San Jose Del MonteStainless steel plateHow to perform a stress test

San Jose Del MonteStainless steel plateHow to perform a stress test

When placing, they should be stored separately according to the different components, and should not...

Tised304L stainless steel priceWhat's hidden behind

Tised304L stainless steel priceWhat's hidden behind

The production and processing of steel plates are also unknown. The so-called 'knowing the root and...

Anci4-ton hydraulic lifting cargo elevatorIt's all for the brand and hard branding

Anci4-ton hydraulic lifting cargo elevatorIt's all for the brand and hard branding

The hydraulic lifting platform is mainly the pressure transmission of hydraulic oil to realize the l...

Mandal2205 stainless steel plateWhat are the requirements for installation

Mandal2205 stainless steel plateWhat are the requirements for installation

It has excellent conductivity, thermal conductivity, ductility and corrosion resistance.Let s elabor...

评论列表

161HP196399230
2024-01-26 09:53:15

San FrancoisAdvance support small conduit The goods have arrived, much better than what you see in the picture!

750HP120486450
2024-01-26 10:27:38

I'm quite satisfied, and the quality and workmanship are even worse. Look back and introduce to friends

47HP158935852
2024-01-26 10:43:39

Your company San FrancoisAdvance support small conduit has a very good service attitude, thank you, and like you.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。