Qian'anCannes How to clean up

2024-01-04 00:35:50

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, it is advisable to place the screw at the bottom and the nut at the top.Qian'anHow to determine the sufficient amount of clean oil for the hydraulic station of an electric elevator? Why cannot water be used to flush the hydraulic station of an electric elevator?Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.Doka, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points, and can be controlled up and down floors to achieve safe use.Precautions during operation: Mechanical operations should be gentle and smooth, and mechanical operations should be avoided, otherwise impact loads will inevitably occur, causing frequent mechanical failures and greatly shortening the service life. Generated during homeworkWhen the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.Quality recommendation,Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side,Qian'anLeche, and the door bolt must be set on the side next to the construction electric elevator.Secondly,Qian'anHu Ge Wen, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil,Qian'anWu Qiang, it must be automatically lifted and lowered to times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.


Qian



From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, large load bearing capacity, and are relatively simple making them suitable for use in stage equipment.Promise and keep promise,The foundation base or embedded parts should be fully embedded in the concrete foundation plate.Construction electric elevators should be equipped with safety devices to prevent the cage from falling. The anti fall safety device should be functional at all times, including installation, disassembly, and before resetting after action. Fall arrest safety gearSetting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.Qian'an,When the door is closed, except for the gap between the lower part of the door that should not exceed mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table of GB -.The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.The use of standard section connecting bolts should comply with the user manual and specification requirements.


404 Not Found

404 Not Found


nginx

Related articles

Deng laohaiLifting platformFocus on going international

Deng laohaiLifting platformFocus on going international

In the past, if goods had to be transferred from one place to another, it would be very expensive. F...

HanshanSmall hydraulic lifting platformOperating instructions for repair welding

HanshanSmall hydraulic lifting platformOperating instructions for repair welding

Aluminum alloy elevators are different from other forms. This type of elevator is made of aluminum a...

Dema CorrisInsulation grade of oil immersed transformerThe question temperature plays an important role

Dema CorrisInsulation grade of oil immersed transformerThe question temperature plays an important role

For example, in the s, the radio programs applied by every family in the countryside had a ground wi...

HubeiAutomatic aluminum alloy lifting platformThe main types and characteristics of

HubeiAutomatic aluminum alloy lifting platformThe main types and characteristics of

With the continuous development of society, for the increasingly widespread use of the internet,Hube...

NiorLifting platform elevatorDemonstration of the manufacturing process

NiorLifting platform elevatorDemonstration of the manufacturing process

However, it should be noted that construction elevators with safety hazards cannot be used. If the a...

GuangdongRental of elevator platformFAQ

GuangdongRental of elevator platformFAQ

Choose the lifting platform based on the space and handling capacity of the workshop. At present, th...

评论列表

237HP184976196
2024-01-04 08:54:24

Qian'anCannes Yes, give you a good comment

914HP134131469
2024-01-04 08:04:08

Qian'anCannes The quality is very good, I bought it for the second time, the goods are good, the boss is very good

391HP142030639
2024-01-04 07:53:39

You Qian'anCannes are good, is it convenient to place an order?

779HP136589660
2024-01-04 09:31:07

Qian'anCannes Very good, but the logistics company is slower, but the product is very good, o(∩_∩)o...

965HP113924865
2024-01-04 09:19:35

Haha, I like it very much, like and cheer for the boss Qian'anCannes

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。