ryan Code for installation of power transformersComprehensive performance analysis

2024-01-14 02:12:55

The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.Difference between dry-type transformer and oil immersed transformer:ryan ,The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation, offset, cracking, loosening, oil leakage, broken strand disconnection,ryan Distribution transformer installation, short-circuit fault marks, hanging of dirty things, etching and turbidity, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.Kaliningler,The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged,ryan 380V to 660V three-phase transformer, the iron core causes large vortex,ryan Transformer circuit, resulting in heat, temperature rise and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.Causes of fire in power transformer


ryan Code for installation of power transformersComprehensive performance analysis



Therefore, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.assets,Oil leakage of heat pipe radiatorHow much is the power transformer() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.


ryan Code for installation of power transformersComprehensive performance analysis



Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.Installation materials,Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.In the electric field of the winding to the yoke, there must be a strong line breaking component, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.ryan ,Causes of fire in power transformerIn order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage it shall be handled properly.

404 Not Found

404 Not Found


nginx

Related articles

KaipingCustomized mobile hydraulic boarding bridgeDaily operation specifications

KaipingCustomized mobile hydraulic boarding bridgeDaily operation specifications

With the listing of Alibaba Group on the New York Stock Exchange in the United States, it will also...

BludenzDrilling fluid slurry pumpAnalysis and application of preparation before replacement

BludenzDrilling fluid slurry pumpAnalysis and application of preparation before replacement

BludenzQuotation slurry pump,  The submersible slurry pump is a kind of submersible pump which is co...

Rio GrandeCapacity specification of power transformerHow to choose accurately

Rio GrandeCapacity specification of power transformerHow to choose accurately

and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star...

Cage wooden box10 meter automatic elevatorDifferent industries

Cage wooden box10 meter automatic elevatorDifferent industries

The concept of hydraulic boarding bridge is the power system of the boarding bridge. The large oil c...

FenyangBoarding axle brandHow to get the price

FenyangBoarding axle brandHow to get the price

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and...

IrelandLifting platform truck for handlingWhere is the convenience of

IrelandLifting platform truck for handlingWhere is the convenience of

When celebrities hold concerts, we all need to use the lifting stage, because if there is no stage t...

评论列表

881HP198728332
2024-01-14 10:23:47

I will find you again next time I have the opportunity.

750HP120486450
2024-01-14 10:47:59

ryan Code for installation of power transformers Arrived, yes, this new model is indeed up to standard, very good

47HP158935852
2024-01-14 10:28:13

After my personal experience, the reputation of this store is quite good. ryan Code for installation of power transformers The quality is more like a diamond. Thank you so much!

409HP184720764
2024-01-14 11:03:45

Let me talk about the quality of the goods first: ryan Code for installation of power transformers Overall it is good, and the packaging is tight. Let’s talk about business services: Like it. Last review express: delivery is fast. The other is to thank the store for discounts, after all, cheap and good products are more real. I hope that the store will give more discounts and notify old customers in time to promote repurchase. I wish business prosperous.

709HP180518493
2024-01-14 10:01:46

Brother, with your support, this new model ryan Code for installation of power transformers is indeed up to standard and very good.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。