BelarusDistribution transformer modelWhat are the processing flow standards for
2023-04-08 10:15:48The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, please connect all routes as far as possible to prevent other faults.Belarus,There is a magnetic induction line crossing in the transformer core, which will cause induced electromotive force on the plan with the magnetic induction line. Because this electric flow creates a closed loop to generate an electric field and forms a vortex, it is called vortex. The existence of vortex makes the transformer core hot and consumes kinetic energy. This kind of loss is called vortex loss.Operation and maintenance management of oil immersed transformerTrani,The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.Due to careless transportation of the transformer and the thin high-voltage conductor,BelarusAdvantages of oil immersed transformer, the transformer was disconnected by vibration (but there was no grounding device).Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.
Falling foreign matters and piercingA kind of power engineering equipment that converts the working voltage and current according to the basic law of magnetic effect of current. In the whole process of power transmission and transformation of power engineering, it is necessary to carry out voltage transformation and blood pressure reduction according to the transformer to reduce the loss of electromagnetic energy in the whole process. Therefore, the power consumption of the processing plant is all connected with kV switching power supply, which is converted into bottom voltage electromagnetic energy through transformer.Oil leakage of bolt or pipe external threadScheme customization,If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.
Generally speaking the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer,BelarusThree phase transformer price,Belarus1000 dry type transformer manufacturer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.Affordable price,After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.Transformer inspection nose sniffing methodDeterioration damage of transformer core insulationBelarus, drilling stop hole is a good way to remove in-situ stress and prevent widening.