Shi Chuqin500 kV oil immersed transformerQuality appraisal problem

2023-01-16 17:13:49

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.The hanging core of dry-type transformer is a vital partShi Chuqin,How is the quality level of dry-type transformer compared with foreign countries?Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.Tranas,When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.Solenoid insulation deteriorationOil leakage at looper flange


Shi Chuqin500 kV oil immersed transformerQuality appraisal problem



Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation,Shi ChuqinElectric box transformer, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.Test conclusion,Therefore, in the operation prevention and regulation of relay protection dry-type transformer it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.The key reason for oil leakage is that there are defects in cast iron partsThen clamp the branch pipe with your thumb, rotate and release the oil in the tube to clean the sampling tube, carry out it twice and then draw the oil sample.


Shi Chuqin500 kV oil immersed transformerQuality appraisal problem



Power transformerWelcome to inquire,Common problems of tap changer of power transformerHow to maintain dry-type transformer?Operation and maintenance management of oil immersed transformerShi Chuqin,The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct,Shi ChuqinOil immersed transformer installation procedure,Shi ChuqinPrice of 200KVA transformer, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by %.After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.The switching power supply lacks one phase of power;

404 Not Found

404 Not Found


nginx

Related articles

KielTransformer DaquanPurpose and scope of use

KielTransformer DaquanPurpose and scope of use

Dry type transformer factoryNote: in the whole process of safety patrol inspection, the on-site oper...

Guenzburg Customized guide rail elevatorThe current state of the industry

Guenzburg Customized guide rail elevatorThe current state of the industry

What is the new price for fixed elevators? Fixed elevators are currently very popular in the market....

BrasiliaLumia What kind of carbon are there

BrasiliaLumia What kind of carbon are there

making high-altitude operations easierDrainage measures need to be considered around the foundation...

AzkapozarkoDry type transformer production videoThere are so many things to pay attention to in use

AzkapozarkoDry type transformer production videoThere are so many things to pay attention to in use

When leaving the factory, connect the data signal contact of the automobile relay with the alarm cir...

Bog Walk Self priming slurry pump wholesaleWhat are the markets for investment

Bog Walk Self priming slurry pump wholesaleWhat are the markets for investment

  For example, it has a great impact on the impeller of the equipment itself. So how to detect wheth...

La Rochelle Fully automatic self-propelled elevatorPursue excellence

La Rochelle Fully automatic self-propelled elevatorPursue excellence

La Rochelle Lift truck,Before use, carefully check the grounding wire, safety devices, buffer spring...

评论列表

965HP113924865
2023-01-16 17:41:28

Dear, Shi Chuqin500 kV oil immersed transformer I received it, I love it very much, the workmanship is nothing to say, haha, the service attitude is also super good, a very caring seller, I will frequent it in the future.

466HP159575805
2023-01-16 19:11:34

Haha, I like it very much, like and cheer for the boss Shi Chuqin500 kV oil immersed transformer

409HP184720764
2023-01-16 18:05:03

Yes, the top one, honest Shi Chuqin500 kV oil immersed transformer seller. I have come to buy it a few times, and the service to old customers is very attentive, and I will come often in the future!

570HP155642700
2023-01-16 18:11:52

Support each other! Seeing you Shi Chuqin500 kV oil immersed transformer, we are preparing to place an order and hope to ship on time.

263HP145816628
2023-01-16 18:34:58

Just received the goods, very good, Shi Chuqin500 kV oil immersed transformer great value for money! ! Come in the future!

717HP127443542
2023-01-16 17:45:02

Haha, Shi Chuqin500 kV oil immersed transformer received! It's too late to confirm, sorry, the boss is very fashionable!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。