El palaisoDry type isolation transformer factoryAnalytical frequency conversion energy saving principle
2022-08-26 12:39:25Manufacturing process and steps of dry-type transformerOutdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow,El palaisoDimensions of 1600KVA oil immersed transformer, wind and sand.El palaiso,The rate of transformer is: n = P / pxo%, that is, when the copper loss of transformer is equivalent to iron loss, the rate is very large. Therefore, the load of transformer is: = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally, it is about %, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.Operation of oil immersed transformerBata(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.Method and process of taking oil sample of power transformer
Power transformerMaintenance contents of power transformerDeterioration damage of transformer core insulationdemand,The noise of dry-type transformer belongs to low-frequency noise. In a small area, and then causes gas vibration noise, the dispersion spacing and adverse effects are very large.Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products,El palaisoProduction process of oil immersed transformer, electrical components and insulating raw materials.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, so as to achieve the pressure management of oil leakage.
In the case of dry-type transformer operation, there is more noise, and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.Installation requirements,Dry type transformer companyThe equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing,El palaisoDry type transformer 600KVA, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask etc.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.El palaiso,The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.Difference between dry-type transformer and oil immersed transformer: