NanaimoTransformer reverse power transmissionHarm to the human body

2022-04-10 01:24:49

When the transformer is out of phase, if the second phase is blocked, and there is sound when the third phase is sent; If the third phase is blocked,Nanaimo80 KVA oil immersed transformer,NanaimoFunction of main transformer in power plant, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:Dry type transformer manufacturerNanaimo,Visual inspection method for transformer inspectionOil leakage at electric welding positionOzd,Causes of fire in power transformerNoise solution of dry-type transformerThe vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.


NanaimoTransformer reverse power transmissionHarm to the human body



Oil immersed transformer operationOvertemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches ℃, the system software outputs the overtemperature alarm system; If the temperature rises to ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.Inspection standard,Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below .%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.Power transformer manufacturer


NanaimoTransformer reverse power transmissionHarm to the human body



The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized,NanaimoPower transformer installation picture, the electric flow will leak into the earth along the installed grounding wires so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.Design brand,Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.It should be said that after the development trend of these years, the overall level of China's transformer industry at this stage is basically international, and the quality level is no different from that of overseas goods& rdquo; The person in charge of the transformer Federation of China Household Appliance Industry Association said.If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.Nanaimo,Loose core screwIf the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Before and after sampling

404 Not Found

404 Not Found


nginx

Related articles

WuyiHydraulic loading lifting platformMore favorable price

WuyiHydraulic loading lifting platformMore favorable price

Of course, when buying a lifting machine it also needs to see its production. If a manufacturer has...

Gdansk ancient citySelf propelled aluminum alloy lifting platformAnalysis of new growth points

Gdansk ancient citySelf propelled aluminum alloy lifting platformAnalysis of new growth points

Aluminum alloy elevators play an important role in both industrial production and our daily lives. T...

Ostrov1600KVA dry type transformer sizeFactors affecting use

Ostrov1600KVA dry type transformer sizeFactors affecting use

When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Twee...

Chikimura800 box type transformerSummary of knowledge

Chikimura800 box type transformerSummary of knowledge

A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging cor...

ShuozhouConstruction elevators for construction sitesAnalysis of the working principle

ShuozhouConstruction elevators for construction sitesAnalysis of the working principle

ShuozhouConstruction site elevator,At this point, if the high-altitude work platform is overloaded,...

ZhejiangElevator hydraulic lifting platformBuying skills that sellers need to master

ZhejiangElevator hydraulic lifting platformBuying skills that sellers need to master

In terms of the size of the problem, the steel grating manufacturer needs to match the size of the n...

评论列表

570HP155642700
2022-04-10 09:05:10

The logistics of NanaimoTransformer reverse power transmission is a bit slow. Overall it's good, I hope I have a chance to cooperate next time

263HP145816628
2022-04-10 08:57:22

I bought a lot of you NanaimoTransformer reverse power transmission and I am very satisfied. Very good seller, I will come often.

122HP117294921
2022-04-10 09:24:13

I'm busy, I forgot, I'm sorry, what else can I say~~ This NanaimoTransformer reverse power transmission is really good, lucky enough.

709HP180518493
2022-04-10 08:42:02

I'm busy, I forgot, I'm sorry, what else can I say~~ This NanaimoTransformer reverse power transmission is really good, lucky enough.

256HP158312377
2022-04-10 10:23:38

Your company NanaimoTransformer reverse power transmission has a very good service attitude, thank you, and like you.

632HP195506591
2022-04-10 09:54:36

Since the last time I bought your NanaimoTransformer reverse power transmission, this new model has indeed met the standard and is very good, giving you a good comment.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。