TarangaThree phase temperature of dry-type transformerIndustry development prospect analysis

2022-11-14 17:12:01

Dry type transformer manufacturerBefore application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, the bottle cap shall be tightly closed and cannot be opened before application.Taranga,In fact, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.Connection group structure of dry-type transformerCorabia,TarangaWind power box transformer,Analysis of common faults of oil immersed transformer:() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator,TarangaDry type transformer setting requirements, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, so as to achieve the pressure management of oil leakage.


TarangaThree phase temperature of dry-type transformerIndustry development prospect analysis



When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.When the full load test is carried out and everything is normal, the load can be connected.Economic management,Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.& ldquo; YN, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock, the phase voltage phasor of the secondary side is at o'clock. That is, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).The method and whole process of taking oil sample of power transformer are as follows:


TarangaThree phase temperature of dry-type transformerIndustry development prospect analysis



In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage,TarangaEnergy saving of distribution transformer, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.Quality inspection report,After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.The top and middle of the transformer oil tank, the flange plate, barrel skin and the middle of the waterproof sleeve at the upper end of the automobile oil tank. The internal iron core and winding clamp are hot due to partial magnetic leakage, resulting in insulation damage.When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?Taranga,The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.It will also produce many faults, effectively deal with various faults of oil immersed transformer make full use of the performance indicators and advantages of oil immersed transformer, and short-circuit fault is more general.

and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault
404 Not Found

404 Not Found


nginx

Related articles

TarangaThree phase temperature of dry-type transformerWhat issues should be considered when choosing

TarangaThree phase temperature of dry-type transformerWhat issues should be considered when choosing

If the volume of power transformer is too small, the transformer will be overloaded for a long time...

评论列表

570HP155642700
2022-11-14 19:02:49

Thank you faithfully, let me buy the dream TarangaThree phase temperature of dry-type transformer, thank you so much!

122HP117294921
2022-11-14 19:07:26

It's worthy of praise, really good, TarangaThree phase temperature of dry-type transformer I like it very much.

632HP195506591
2022-11-14 18:00:31

Really a good seller. I have to find you if I have this TarangaThree phase temperature of dry-type transformer demand in the future!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。