JiusamoPower transformer calculation sheetIndustry Composite Index

2023-12-02 17:27:03

What is the wiring mode of dry-type transformer?Due to poor sealing generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.Jiusamo, a group of overvoltage maintenance high-voltage Arresters (such as ycs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.The voltage regulating tap changer is not in place or poorDarayya,The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.Oil leakage of cast iron partsFor the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, power failure damage to machinery and equipment, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.If the input of dry-type transformer is an alternating switching power supply, its output voltage is directly proportional to the coil turn ratio of the output input solenoid coil. If a rechargeable battery is used, because it is DC, add a circuit in the input power supply circuit to change it into a continuously changing voltage. In that way, the alternating DC current can be obtained at the output end.There are many connection groups of dry-type transformers, and the selected structures and connections are also different. Then, what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.Range,If the above provisions are not met, the problem of dryness shall be solved. Generally it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach,Jiusamo500KVA price of power transformer, such as ventilation duct, and there shall be no dirt.Dry type transformerBrief introduction of zero line of power transformer


JiusamoPower transformer calculation sheetIndustry Composite Index



Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition,JiusamoSpecification of oil immersed transformer, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.Trustworthy,For kVA power engineering transformer,JiusamoS13 oil immersed transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.Dry type transformer is a common electrical equipment, which can be used to convert the alternating voltage of one standard value into another standard value of the same frequency. The step-up dry-type transformer is used to convert the low-grade alternating voltage into another high-grade alternating voltage of the same frequency. It is widely used in high-frequency industries, such as variable frequency power supply.Analysis of common faults of oil immersed transformer:Jiusamo,Power transformerWhen checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, turn on the photo flash when it's light, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.

404 Not Found

404 Not Found


nginx

Related articles

Santa AnaSmall deep well pumpWhat are the uses and features

Santa AnaSmall deep well pumpWhat are the uses and features

  With the continuous development of slurry pump technology, submersible slurry pump appears in resp...

Saguenay Distribution rectifier transformerHow to do a good job of cold treatment

Saguenay Distribution rectifier transformerHow to do a good job of cold treatment

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sampl...

PetrikovOil immersed transformer oil storage tankHow to choose the medium for cooling

PetrikovOil immersed transformer oil storage tankHow to choose the medium for cooling

if the second phase is blockedA specific part of dry-type transformer is the hanging core of dry-ty...

SeksadHydraulic lifting platform for warehouse useMaintenance process in the process

SeksadHydraulic lifting platform for warehouse useMaintenance process in the process

However, when using construction elevators, the first thing to ensure is the safety of the workers'...

BielefeldDouble column aluminum alloy elevatorAdjust industry process parameters

BielefeldDouble column aluminum alloy elevatorAdjust industry process parameters

The standard rack free design of the lifting and lowering machine with high safety performance ensur...

Inner MongoliaSelf moving lifting platformThe return difference fluctuates accordingly

Inner MongoliaSelf moving lifting platformThe return difference fluctuates accordingly

Check the relative orientation between the cable support wall and the cable guide frameAdjust and co...

评论列表

78HP121928405
2023-12-02 19:02:28

The first time I found what I wanted JiusamoPower transformer calculation sheet, I was in a good mood! Boss, come on, I hope to continue to make good products.

750HP120486450
2023-12-02 19:22:39

I want to change a supplier and see you on the Internet, can I give a detailed explanation JiusamoPower transformer calculation sheet

935HP175192871
2023-12-02 17:52:34

Just paid, when will JiusamoPower transformer calculation sheet arrive, boss.

224HP159430236
2023-12-02 17:37:00

After so many years of online shopping, this is the first time I have taken this seriously. I was holding my phone and staring at the screen with a sense of anxiety, and I dared not start. In order to write a notarized evaluation of JiusamoPower transformer calculation sheet, send four characters, high quality and low price. This is my happy online shopping, thank you!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。