Tony kapanSelf propelled hollow grouting anchor manufacturerMaterial selection of standard parts

2023-12-19 02:27:07
965HP113924865Building materials76

In the construction of some grouting pipes, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.Disposal method: the grouting pipe shall be shortened according to the specification.Tony kapan,Inner diameter: mm; Outer diameter: mm; Inner diameter tolerance: ± .mm; Length of each roll: m. The grouting pipe is used to pad the bottom of the horseshoe, change the cooperation specification of the mold, and adjust the cooperation space between the lower tire and the horseshoe.Copenhagen,Among the many imported projects, the development of the production technology of automobile door and window sealing strips is the most representative. Through the introduction of sealing strip production lines from Japan, Germany, Italy, Britain and other countries, up to now, domestic manufacturers have introduced more than sealing strip production lines. In addition to pure rubber sealing strips, sealing strips of various composite structures, metal skeleton and various rubber composite sealing strips, rubber and plastic composite sealing strips can be produced. At present, the overall level of China&#;s sealing strip production technology has basically reached the level of foreign countries in the s, and has become a grouting pipe. Because some projects are not easy to detect when they are manufactured, and the quality of the grouting pipe as a channel for testing instruments has become crucial. If the quality of the grouting pipe is poor, which has the characteristics of thin pipe wall, steel saving, impermeability, pressure resistance and high strength is generally used for post tensioned reserved holes in prestressed structures. When the grouting pipe is used, it is very convenient to operate. However it can be directly bound to the reinforcement framework. Because the grouting pipe is very light,Tony kapanGrouting hollow anchor manufacturer, attention should be paid to the balance of its axis during installation.However, not all grouting pipe products can achieve this effect. Some inferior grouting pipe products not only fail to achieve the expected effect in use, but also have problems such as low grouting efficiency, awesome which seriously affect the grouting effect of the grouting pipe and the progress of the whole project. The quality of grouting effect comes from the selection of high-quality grouting pipe products. Shengpeng grouting pipe is a good choice for you to choose grouting pipe products because of its high strength, simple connection and high cost performance! Grouting pipe the grouting pipe is a kind of geosynthetic material formed by ultrasonic welding, which is composed of a steel plastic composite reinforced belt (built-in high-strength carbon spring steel wire (stress material) and wrapped with polyethylene resin (protective material) and arranged at right angles to the plane longitude and latitude. It is a comprehensive product of existing rigid reinforcement (flat steel strip, ribbed steel strip, galvanized steel strip, stainless steel strip, reinforced concrete strip, etc.) and flexible reinforcement (polypropylene strip, plastic grouting pipe, warp knitted grouting pipe, etc.). Because of its high tensile strength, low elongation (≤ %), small creep, it can effectively treat the soft soil foundation, overcome the uneven settlement of the soil, greatly enhance the bearing capacity of the foundation and improve the overall performance of the foundation; It can be widely used in road engineering, railway engineering, retaining structure, dam engineering water conservancy engineering and tunnel engineering; It has remarkable safeguard effect and good social and economic benefits against rutting and pavement cracking.A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough.


Tony kapanSelf propelled hollow grouting anchor manufacturerMaterial selection of standard parts



The Xiaobian of prestressed machines and tools reminds us that there are many forms of grouting pipes, which can be distinguished from different angles, including the following. According to the type of reinforcement of the grouting pipe, it can be divided into the grouting pipe of thick reinforcement of the grouting pipe, the grouting pipe of parallel reinforcement (wire) bundle of the grouting pipe, and the grouting pipe of steel strand bundle of the grouting pipe. For thick reinforcement, one grouting pipe is generally used to anchor one reinforcement. For tendons and steel strands, a grouting pipe must anchor several steel bars or steel strands at the same time which are often arranged in a ring or circle, or in a rectangle. Obviously, due to the different number and arrangement of prestressed reinforcement, the form and structure of grouting pipe will also be different. According to the principle of grouting pipe and transmitting pretension, it can be divided into grouting pipe relying on bearing pressure, grouting pipe relying on friction and grouting pipe relying on adhesion. The multiple grouting pipes are fully combined with two as a detection profile, and the detection is completed for multiple profiles respectively.The use of grouting pipes has become indispensable in modern building construction, ranging from super high-rise and high-rise buildings to multi-storey buildings and indoor decoration construction. China has a longer history of using grouting pipes. Many of China&#;s ancient buildings have been listed as world-class material and cultural heritage, because China&#;s ancient buildings are very technical in construction. In China, before and in the early s, grouting pipes made of bamboo and wood were used in the construction of buildings. After the mounting bracket is welded on the surface of the grouting pipe, push the strain gauge in a stable and free state without bending and twisting; The mounting bracket and strain gauge shall be installed parallel to the support axis; When tightening the screw, pay attention to reasonably controlling the frequency of the strain gauge; The installation position of the strain gauge shall be selected at the position suitable for protection as far as possible.Latest consultation,The glass fiber grouting pipe has the characteristics of easy construction, high temperature resistance, corrosion resistance, low elongation, high elastic modulus, no long-term creep, meeting the requirements of environmental protection, and the tensile strength can reach kn / m, which provides sufficient strength to prevent reflection cracks. When it breaks, its elongation is less than %, it has high deformation resistance and good compatibility with asphalt mixture.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistanceThe following aspects shall be paid attention to during the construction of grouting pipe: when the construction personnel are binding reinforcement and erecting formwork, reliable fixation measures must be taken for the buried grouting pipe to avoid displacement during concrete pouring and ensure the correct position of the grouting pipe in the concrete. When fixing the grouting pipe,Tony kapan50lead small conduit, only the allowable part of the grouting pipe can be perforated, and the body part shall not be damaged. The grouting pipe shall be fixed according to the construction specifications required by the design. The common fixing methods are: using additional reinforcement; Fixed with special fixtures; Fix with lead wire and formwork. No matter what fixing method is adopted, the grouting pipe must be positioned accurately, without damaging the effective part of the grouting pipe, so as to facilitate concrete pouring and tamping. During the construction of the grouting pipe, there are many sharp stones and sharp edged reinforcement in the concrete, so when pouring, vibrating and positioning the grouting pipe, so as to avoid piercing the grouting pipe due to excessive force.?


Tony kapanSelf propelled hollow grouting anchor manufacturerMaterial selection of standard parts



Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint, nozzle or bottom of the grouting pipe is not tightly sealed, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.Honest management,The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption, it is OK if the pipe wall can bear the lateral pressure of new concrete, not necessarily the thicker the better.Development trend editor since the advent of Portland cement in , cement grouting has been the main grouting method in engineering. However, ordinary cement can only be filled with sand gravel or pores with a diameter greater than . ~ .mm due to its coarse particles. Therefore, improving the fineness of cement particles has become the main way to improve the groutability of cement slurry. Some countries have developed a kind of ultra-fine cement, which can pour fine sand with permeability coefficient of - ~ -cm / s and micro cracks in rocks. It is a promising granular grouting material. Propionate is a kind of water-soluble polymer chemical slurry, whose viscosity is close to that of water. It is widely used in anti-seepage grouting and dynamic water plugging of fine rock cracks and medium fine sand layers. However,Tony kapanTunnel leading small conduit and pipe shed, so most of them have stopped production and use. In , AC slurry was developed in the United States, and in , ac-ms slurry was developed in China. The toxicity of this kind of slurry is very small (only % of the toxicity of propionate). It is an ideal anti-seepage slurry. The non alkaline silicate slurry developed in Japan has no alkaline pollution to groundwater, low viscosity, high gel strength, good durability and does not change the pH value of groundwater. [] Grouting method is divided into ceramic process grouting and construction engineering grouting. Ceramic process grouting is the process of using the prepared mud injection in ceramic production. Construction engineering is to use appropriate methods to inject some curable grout into the cracks or pores of the rock and soil foundation, and to improve its physical and mechanical properties through replacement, filling, extrusion and other methods to make ceramic bodies suitable for processing.Make it into a certain shape, size and specification. Seepage prevention Water plugging The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.Tony kapan, and the convex grooves are equipped with sealing rings. During installation and the height of the saddle shaped curved surface is changed to make the pipe wall crawl and slide along the accurate saddle shaped curved surface.Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage?Two convex grooves are planned at the end of the bell end of the double seal clamp grouting pipe, the spigot end of the product is stabbed into the bell end. The grouting pipe then kneads the two convex grooves together with a special hydraulic clamp, and the pipe at the kneaded part is shortened and deformed after being stressed. The outer pipe between the two convex grooves is deeply embedded into the inner pipe, and then the connection of the product is completed; After being kneaded, a rubber sealing ring is deformed and pasted between two layers of pipes, which plays a double safety sealing effect.


404 Not Found

404 Not Found


nginx

Related articles

Tony kapanSelf propelled hollow grouting anchor manufacturerMaterial selection of standard parts

Tony kapanSelf propelled hollow grouting anchor manufacturerMaterial selection of standard parts

In the process of using the acoustic pipe, it is necessary to have a detailed understanding of its i...

评论列表

535HP136858825
2023-12-19 11:07:08

Good seller, thank you. My colleagues like Tony kapanSelf propelled hollow grouting anchor manufacturer very much. Come again next time!

570HP155642700
2023-12-19 10:28:53

Just paid, when will Tony kapanSelf propelled hollow grouting anchor manufacturer arrive, boss.

122HP117294921
2023-12-19 11:03:52

Tony kapanSelf propelled hollow grouting anchor manufacturer The goods have arrived, much better than what you see in the picture!

717HP127443542
2023-12-19 10:39:38

Very good buyer. Thank you. My colleagues like it very much Tony kapanSelf propelled hollow grouting anchor manufacturer. Come again next time

256HP158312377
2023-12-19 09:45:42

I bought a lot of you Tony kapanSelf propelled hollow grouting anchor manufacturer and I am very satisfied. Very good seller, I will come often.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。